1 / 3

Projekttreffen REBOUND 23. September 2011 Zentrum für Europäische Wirtschaftsforschung (ZEW)

Projekttreffen REBOUND 23. September 2011 Zentrum für Europäische Wirtschaftsforschung (ZEW). Stand des Projekts Erster Statusbericht kommentarlos akzeptiert Zwei Werkstattberichte liegen vor (RWI, AP2) Erste Ergebnisse in AP1 (ISI, ZIRN) First Draft des Fragebogens. To Do (Zeitplan)

Download Presentation

Projekttreffen REBOUND 23. September 2011 Zentrum für Europäische Wirtschaftsforschung (ZEW)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Projekttreffen REBOUND 23. September 2011 Zentrum für Europäische Wirtschaftsforschung (ZEW)

  2. Stand des Projekts • Erster Statusbericht kommentarlos akzeptiert • Zwei Werkstattberichte liegen vor (RWI, AP2) • Erste Ergebnisse in AP1 (ISI, ZIRN) • First Draft des Fragebogens

  3. To Do (Zeitplan) • 21. Oktober: Workshop Praxisbeirat • Bis Anfang November: Fertigstellung Fragebogen • November – Januar: Durchführung Erhebung • Projekttreffen März ?? • März 2012: Beginn AP4 • Bis September 2012: Abschluss von AP3 laut Zeitplan • 3./4. Quartal 2012: 3. Workshop Praxisbeirat • – Projekttreffen im Vorfeld