An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modernization of production plant and production processes implemented in Zagrebačka pivovara in period from 1995 till 2012 Borislav Šćulac Zagrebačka pivovara 1

  2. Introduction History of Zagrebačka pivovara Modernization of production equipment in period 1995-2012 Implementation of modern brewing processes in period 1995-2012 Results of equipment and brewing processes modernization Development so far and plans for future

  3. History of Zagrebačka pivovara Founded in 1892 at current location Small brewers manufacturers couldn’t cover increasing demand Initiators for new brewery were count Gustav Pongratz i baron Petar Dragutin Turković Production buildings were designed by architect Kun Weidmanna Initial capacity was 30.000 hl/year Opening celebration was 12 July 1893 Beer garden had electric lights, first in town and 15 years before than city of Zagreb Ozujsko brand launch, today the most popular beer in Croatia A large modernization of the brewery happened during sixties and seventies following the growth of beer sales Privatization in 1994 Interberew became major shareholder Today is part of MolsonCoors Zagrebačka pivovara is the biggest Croatian brewery

  4. Modernization of production equipment in period 1995-2012 Privatization in 1994 was followed by huge capital investment scope Replacement of obsolete brewing & packaging equipment Production capacity increase Key performance Indicators increase  efficiency increase Quality Assurance of processes and final products Assurance of environment protection Assurance of safety on work • Total Capital Expenditure in 17 years was 63.845.000 €

  5. The most important capital investments Brewhouse renewal: Meura Mash filter, hammer mill, wort decantation tank, wort cooler , CIP and other related equipment New fermentation building with 17 cylindrical conical tanks, yeast propagation and yeast storage tanks, CIP and other related equipment New beer filtration line with candle filter, pVpp, carbonation and blending unit Automation, Energy and Fluids recoveries Renewal and reconstruction of glass filling lines Renewal and reconstruction of KEG line with capacity increase Installation of PET filling line Installation of can filling line Decreasing of noise emission : new facades and noise protection walls Renewal and reconstruction of cooling plant with increase of safety CO2 purification plant Complete replacement of sewer system with separation of technical and rain water including new buffer basin for waste water Wide modernization of production equipment has been done Modernization of production equipment in period 1995-2012

  6. Implementation of modern brewing processes in period 1995-2012 High Gravity Brewing High Gravity wort in brewhouse - 15 Plato to 20 Plato Adjustment on final gravity after beer filtration phase Wort fermentation till diacetyl reduction HG wort fermentation  3 do 4 Plato/day Diacetyl reduction on fermentation temperature Green beer cooling starts when diacetyl reduction is finished Cold maturation Colloidal stability assurance by maturation on -1 ºC Implementation of modern brewing processes resulted with better control of brewing processes and with standard quality of finish goods

  7. Results of equipment and brewing processes modernization Increase of production capacity enabled increase of sales volume Capacity increase from 1.100.000 hl/y in 1995. to 2.000.000 hl/y today • Technical productivity increase  lower industrial cost

  8. Lower Energy & Fluid consumption  lower industrial cost Results of equipment and brewing processes modernization

  9. Development so far and plans for future Resources management Wide modernization of production equipment done in period 1995-2012 Strengthened Sales and Marketing teams Brands development – leading brands in core, premium and value segments Management System developed for brewing industry Focus on innovations First on Croatian beer market with branded crates made of polyethylene First on Croatian beer market with complete replacement of old bottles First on Croatian beer market with PET packaging Complete beer portfolio – 11 beer and beer-mixes brands Market share increase from29% in 1995to 43% in 2013 Plans for future Continuation of production equipment modernization related with technology development Continuation of innovations both liquid and packaging Already in 2013 capital expenditure of 10.000.000 € related with new bottles launch

  10. Conclusion Zagrebačka pivovara today has modern and efficient production Wide modernization of production equipment done in period 1995-2012 Total Capital Expenditure of 63.845.000 € Implemented modern brewing processes Realized capacity increase and efficient production Realized sustainable development with care about environment Realized leading position on Croatian beer market Zagrebačka pivovara is market leader with 43% market share Continuous focus on innovations

  11. Questions ?