CLIC baseline changes G.Geschonke

CLIC baseline changes G.Geschonke. General and upgrade. E-Scan. E-Scan. space. fix parmeter. E-Scan. . new scheme. . fix parmeter. Drive Beam generation and distribution. cost. E-Scan. cost. fix parameter. E-Scan. E-Scan. beam dyn. resist. wall. cost. Slide.

freya
Download Presentation

CLIC baseline changes G.Geschonke

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC baseline changes G.Geschonke ACE 2.2.2010 G.Geschonke

  2. General and upgrade E-Scan E-Scan space fix parmeter E-Scan  new scheme  fix parmeter ACE 2.2.2010 G.Geschonke

  3. Drive Beam generation and distribution cost E-Scan cost fix parameter E-Scan E-Scan beam dyn. resist. wall cost Slide ACE 2.2.2010 G.Geschonke

  4. Single DB complex at 500 GeV 3 TeV 0.5 TeV ACE 2.2.2010 G.Geschonke

  5. Drrive Beam phase control Slide from Daniel Schulte ACE 2.2.2010 G.Geschonke

  6. Main Beam Injector complex significant beam loading funneling? Increase e+ capture efficiency Slide civ. engineering optimisation beam dyn cost beam dyn polarisation civ. engineering  ACE 2.2.2010 G.Geschonke

  7. 500 GeV to 3 TeV ACE 2.2.2010 G.Geschonke

  8. Main Beam Linac  cost reliability of BBF cost cost ACE 2.2.2010 G.Geschonke

  9. Accelerating structure, PETS, Module performance  new system new system cost cost cost to be developed cost ACE 2.2.2010 G.Geschonke

  10. Machine detector interface Beam Delivery system  slide new development Concept M.Modena new development  Slide fix design  ACE 2.2.2010 G.Geschonke

  11. L * Slide from D.Schulte S ACE 2.2.2010 G.Geschonke

  12. IP Beam control Slide from D. Schulte ACE 2.2.2010 G.Geschonke

  13. Conclusion • Coherent approach to baseline changes • freeze decisions for CDR end March ACE 2.2.2010 G.Geschonke

  14. ACE 2.2.2010 G.Geschonke

  15. ACE 2.2.2010 G.Geschonke