1 / 11

HCAL DPG Status

HCAL DPG Status. Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011. Current status. Done: HCAL Calibration have been provided for CMSSW_4_2_0 Response correction function to correct for HB channels with missing LO filter Online conditions have been updated

geoff
Download Presentation

HCAL DPG Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HCAL DPG Status Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011

  2. Current status • Done: • HCAL Calibration have been provided for CMSSW_4_2_0 • Response correction function to correct for HB channels • with missing LO filter • Online conditions have been updated • Rate of high energy hits have been reduced after HF sleeve • replacement • On going urgent tasks: • Migrating HF filters to HLT • Adding RBX/HPD noise filter in some MET trigger paths • Investigating methods to reduce L1 HF pre-triggering: apply BX-1 veto or/and develop L1 TP filters • Reducing Out Of Time pile-up

  3. Calibration and condition status • 2011 startup conditions - done • ChannelQuality • Pedestals • HF gains after sleeve replacement • Response corrections with phisym (|ieta|<41) and scale (|ieta|<22-23) • Start of data taking with 3.11(4.1): • Included phi-symmetry in L1 and HLT+reco • Reprocessing with 4.2: • Include the full HCAL calibration at HLT and Reco; L1 will stay with phisym corrections • Caveat: iphi=-6, iphi=-32 • Special treatment for HLT and Reco. Response correction kept = 1 at L1.

  4. L1 rate Constant Response correction for Problematic channels Iphi=-6 and Iphi=32 Note: at HLT and RECO we are using function to account for the missing neutral energy Filter at L0

  5. Reconstruction and Calibration plans • Calibrations included for CMSSW4.2 • HBHE relative and absolute • HF relative • Postponed to the next release • HF absolute scale (Zee) • On going: improving calibration with higher statistics; CASTOR and ZDC calibration • Reconstruction (on going): • Minor changes in the definition of rechit bits • Unify strategy of rechit flags used for flagging noise • Include • More in: • https://twiki.cern.ch/twiki/bin/view/CMS/HcalDPG2011Tasks

  6. Pre-triggering • Observe a rate from triggering in the BX-1 crossing • due to PMT window events . • Adjustment of HF signal position allows PMT • window events arriving in the earlier crossing • Possible solutions: • - Veto on BX-1 • Run 162929 looks very promising: 1 pre-triggered • event over 55794 • - L1 TP filters • Code exists but parameters need tuning and firmware requires • update. Filters rely on isolation may appear to be less effective • as occupancy increases and may disturb some physics channels

  7. Pre-triggering (Jim)

  8. Noise • Tuning HBHE noise filters in PU conditions from 75 ns->50ns. • First results looks promising but need extensive testing before making filters • default . • Plan to migrate HF noise filters (Topological and Pulse shape) to HLT • HF topological filter becomes less efficient with changing reconstruction from 4TS • to 2TS • HLT versions of Filters were presented to the TSG. • We prefer not to apply filters at HLT unless absolutely necessary • Some caveats: • Not RECO but AOD will be stored at Tier2-> access to TS may be • not possible unless we ask for HCAL DPG skim. • Today, after HCAL general we will have the • meeting dedicated HF noise sources

  9. Out of time Pileup • Initial pileup discussion with Jetmet • https://indico.cern.ch/conferenceDisplay.py?confId=134118 • Jamboree • https://indico.cern.ch/conferenceDisplay.py?confId=134144 • Developments: • Change HBHE energy reconstruction from 4TS to 2TS • Develop filters to remove OOT pileup • Fit pulse shape train in TS2-TS9 • Plus pileup subtraction methods provided by JetMET. • Need to verify what option gives the best Jet and • MET resolution

  10. HCAL Offline shifts • Shifts are on going in SINP MSU and FNAL on • daily basis.

  11. HO Task force • Verify simulation of HO including SiPm • Evaluate HO usage for the different objects and • recommend appropriate reconstruction settings • Develop a calibration strategy of HO • Provide calibration constants for HO • In collaboration with JetMET demonstrate • improvements in jet reconstruction

More Related