1 / 5

Second WATO Meeting

San Francisco, USA, 19 July 2011. Second WATO Meeting. Agenda. ARIB Yoshinori Ohmura, Satoshi Imata, Takashi Shono TTA Elly Kim WiMAX Forum Jayne Stancavage IEEE Roger Marks, Terry DeCourcelle , Takashi Shono. Participating Members and Delegates.

ghazi
Download Presentation

Second WATO Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. San Francisco, USA, 19July 2011 Second WATO Meeting

  2. Agenda

  3. ARIB Yoshinori Ohmura, Satoshi Imata, Takashi Shono TTA EllyKim WiMAX Forum Jayne Stancavage IEEE Roger Marks, Terry DeCourcelle, Takashi Shono Participating Members and Delegates

  4. Objective #1: Help ensure that transpositions of WirelessMAN-Advanced GCS complete in time in the right way Clarifications: It should be noted that the same URL is fine for all clauses of each specification in the transposition table Some editorial changes were made to Certification C at the last WP 5D meeting although it isn’t notified to Transposing Organizations – Please refer to IEEE’s draft Certification C Schedule/plan for transposition - Any issues? Liaison from ARIB (L802.16-11/0035), raising two issues for transpositions - Agreement and documentation Deviations in transposed standards – Please be aware of “Note 1” of Certification C, saying: Note 1: Transposing Organization shall clearly indicate the specific text of any differing/exception material (e.g., regional differences). Objectives for the Meeting

  5. Objective #2: Commence a preparation for a revision of Rec. ITU-R M.[IMT.RSPEC] IEEE, as WirelessMAN-Advanced GCS Proponent, to advise WATO members of its new projects relating to WirelessMAN-Advanced: P802.16Rev3 and P802.16.1 Ask for opinions on timing of revision of IMT.RSPEC – If we would get Annex 2 updated by the end of 2013, we need to notify WP 5D of our intent at their October meeting Meeting Y-1: October 2011 Meeting Y: [April] 2012 Meeting Y+1: [October] 2012 Meeting Y+2A: [February] 2013 Meeting Y+2B: [June] 2013 Transpositions: Between [June] 2013 and [September] 2013 SG 5: [November] 2013 Objectives for the Meeting

More Related