An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liaison Report from 802.18 Date:January 23, 2014 Notice:This document has been prepared to assist IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. John Notor, LileeSystems

  2. This document summarizes the activities of the IEEE 802.18 Radio Regulatory Technical Advisory Group (RR-TAG) during the IEEE 802 January 2014 Interim Meeting at the Hyatt Century Plaza, Los Angeles, CA. Overview John Notor, Lilee Systems

  3. FCC Documents Approved • The RR-TAG approved the following document for EC review at the closing plenary and, pending approval, submission to the FCC. • A DSRC Coexistence Tiger Team update to the FCC OET on status of the activity:18-14/07r1. John Notor, Lilee Systems

  4. ITU-R Documents Approved • The RR-TAG approved the following document for EC review in the EC closing plenary and, pending approval, submission to ITU-R: • Proposed Draft: Comments on Working Document towards a Preliminary Draft New REPORT ITU-R SM.[SMART_GRID], 18-13/117r5. John Notor, Lilee Systems

  5. UK OfcomDocuments Approved • The RR-TAG approved the following document for EC review in the EC closing plenary and, pending approval, submission UK Ofcom: • Response to the Ofcom consultation on the 870-876 MHz and 915-921 MHz Bands, 18-14/001r4. John Notor, Lilee Systems