Midland-operator-increases-footage-per-day-by-almost-94-enhances-BHA-reliability PDF 4

An operator working in the Midland Basin had been achieving mid-tier drilling<br>performance overall but had been falling short in one key area. Their intermediate<br>string operations were consistently the slowest when compared to similar offset<br>operations.<br>They were drilling 1,400 feet per day, while top operators were achieving nearly<br>3,900 feet per day; and while they were using an average of 3.3 intermediate<br>BHAs, the top-performing operator was averaging just one. H&P was tasked with<br>delivering a solution to help the client reach its production potential.<br>Solution<br>To better understand the host

Download Presentation

Midland-operator-increases-footage-per-day-by-almost-94-enhances-BHA-reliability PDF 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


More Related