1 / 1

PATD / ICTS / Test Std. / IG control no.

V C 3. Quality Bulletin. A.D. Pandey. S.N. Chamola. Naresh Pant. Horizontal deployment. Running model. New model. Re-FPA. New part approval. Prepared CKD App. Model. S/No. Product. Claim section. Claim date. Date of imp. May’09. Kas/Ref /09/12. REF.

howie
Download Presentation

PATD / ICTS / Test Std. / IG control no.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VC3 Quality Bulletin A.D. Pandey S.N. Chamola Naresh Pant Horizontal deployment Running model New model Re-FPA New part approval Prepared CKD App Model S/No. Product Claim section Claim date Date of imp May’09 Kas/Ref /09/12 REF All DC & FF Model Field 04.06.09 Quality issue Cause Count measure PERM: Filament tape started to stop the field failure of components fallen down & breakage in all DC model • Filament Tape is being used in place of Nitto Tape. Analysis Why?Filament tape used to fix the component. Why?To give extra strength to the components in transit. Why?  Components fallen down & Breakage reported from field in transportation. Before QA System Improved QA System References Started using Filament Tape To give extra strength to the Components breakage & fallen down Reported in transportation Nitto Tape was used. PATD / ICTS / Test Std. / IG control no. ECN No. 5000000006727 JIR control no. Others ( Refer OQC/ELT Revision ) Create Sustainable Life Global Leader Global Quality

More Related