An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011

  2. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 Cast in place of process pipes in tunnel

  3. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 156ft high Biofilter Exhaust delivery

  4. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 Installed Biofilter Exhaust stack

  5. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 Catch basin installation west of Maturation Building

  6. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 • Drywall installation in Ground Floor offices of Administration Building

  7. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 • Site Overview looking South

  8. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 • Inside of Blower Room

  9. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 • Inside of Blower Room (view from west side)

  10. Organics Waste Processing Facility Construction Progress UpdateMay 12, 2011 • View of tip floor, transfer area and tunnels