1 / 9

Pan-SHARP Medication Reconciliation Kickoff Teleconference

Pan-SHARP Medication Reconciliation Kickoff Teleconference. December 8, 2011. Agenda. 100% Apache 2.0 License. Med Rec “Mercury”. SHARPn. CCD SAMPLES. Clinical Notes SAMPLES. SMART. SHARPC. SMART Med-Rec App MD/RN. Parser NLP CEM. CEM- SMART Transform. Med-Rec Algorithms.

iorwen
Download Presentation

Pan-SHARP Medication Reconciliation Kickoff Teleconference

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pan-SHARP Medication Reconciliation Kickoff Teleconference December 8, 2011

  2. Agenda

  3. 100% Apache 2.0 License Med Rec “Mercury” SHARPn CCD SAMPLES Clinical Notes SAMPLES SMART SHARPC SMARTMed-RecApp MD/RN Parser NLP CEM CEM- SMART Transform Med-Rec Algorithms Med Instructions Provenance Data Device Data Feeds SHARPS MD PnP

  4. Mercury Bill of Materials Articulated Needs Connecting the Pieces • 2 SHARPC (SMART) MR Apps • 1 SMART Medication List Object • 1 SHARPC Med Rec back-end reconciliation algorithm • 1 SMART Container populated by 30 patient records from SHARPnPipeline • 1 MD PnP Software component that delivers device data as CEM XML • 1 SHARPn Software component to translate CEM XML to SMART RDF • 1 SHARPS Meta-data tagger that provides output provenance • Optional: 1 SMART Direct App Implementation SMART • SHARPC • Data Model • App Integration • SHARPn • CEMs MD PnP • SMART • Data requirements (by mid-January) • SHARPn/SMART • Data format (by March) SHARPn • Sample data SHARPS • SMART • Requirements for the signatures developed by a SMART App • Import tool for signed CEM and provenance display

  5. High-level Timeline and Dependencies (revised)

  6. Product Manager Project Manager Roles & Responsibilities • Jorge Herskovic – SHARPc, UTH • Product Requirements Document • Washington Memo • Software Requirement Specification • Testing • Overall technical management of Pan-SHARP Med Rec Contact Info: Jorge.R.Herskovic@uth.tmc.edu 832-366-4138 Jessica Nadler – SHARPn, Deloitte • Integrated Project Plan • Facilitating dependencies • Support of ongoing communications • Contact Info: • jnadler@deloitte.com • 202-341-0819 • Team • Ross Martin – rosmartin@deloitte.com • Rayneisha Watson – rawatson@deloitte.com

  7. January 27th Meeting Teleconferences Other needs? Wiki Communications & Logistics • Biweekly XO calls starting in 2012 Pan-SHARP Medication Reconciliation wiki • Hosted on SHARPn wiki • http://informatics.mayo.edu/sharp/index.php/Main_Page#Proposal • Access by the end of the day • Log-in and the Pan-SHARP is on the left navigation • Log-in will be first initial and last name, first two letters capital (i.e. JNadler) • All initial passwords are: welcome • Email from a Mayo account that access has been granted • Time and Location • Washington, DC • 10am to 5pm ET • Deloitte Rosslyn Office at 1919 N. Lynn St. in Arlington, VA • Easily accessible from DCA via Metro or cab ~15 minutes • ~40 minutes from IAD • Potentially a telepresence suite at the Deloitte G St. Office in downtown DC • Please contact Jessica by Dec. 16 if this is of interest and you have access to a telepresence suite on the other end

  8. Outstanding Questions ? • How data will flow through the Mercury version? • Up-front generation of SMART RDF graphs that will (then) be static, and fed to a med rec app according to the SMART API? • What recommendations are SHARPS making and how do they fit ?

  9. What do you need to get started? What do we need to get started? See you in January! Next Steps • Meetings • Artifacts • Project timelines to generate an overall project plan • Identify handoffs • Schedule a regular bi-weekly call for XOs

More Related