1 / 1

Integration Testing – A Complete Overview

Integration testing primarily focuses on verifying data communication among different modules of the software project. Integration tests determine the effectiveness and performance of different software modules when they are connected to each other. It rather determines whether a system of multiple modules work together as per the requirements specified.<br><br>https://www.testingxperts.com/blog/integration-testing<br>

Download Presentation

Integration Testing – A Complete Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integration Testing Integration testing is a software testing process in which the software components or individual units of the software are tested to validate interactions among software system modules. Steps involved in performing an Integration Test Prepare the integration test plan A test plan helps the teams to maintain the flow the of integration test. Identify modules to be tested first Determine the modules that require integration testing on high priority. Design the test cases, test scenarios, and test scripts accordingly It is very essential to examine the interface while designing the test cases and test scenarios. Choose the automation tool and run the test After preparing the test scripts and test cases, an automation tool has to be selected. Track the defects, record, and save the results Once the test is completed, check the defects, if there are any defects report them. Retest to validate the completeness of the test: This step has to be repeated until the integration testing is complete and all the conditions are fulfilled. THANK YOU

More Related