1 / 20

Holistic Water Management

Holistic Water Management. Catchment Selection. Project Specification. Recommend a suitable catchment using following criteria: Agricultural area and area of development Issues in upper and lower catchment Water resources issues (all sectors) Flood defence issues

jaguar
Download Presentation

Holistic Water Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Holistic Water Management Catchment Selection

  2. Project Specification • Recommend a suitable catchment using following criteria: • Agricultural area and area of development • Issues in upper and lower catchment • Water resources issues (all sectors) • Flood defence issues • Consider existing infrastructure • Water Dependent Environments • Water Framework Directive issues

  3. Results

  4. Methodology • Selection criteria • Catchment characteristics • Environmental Issues • Water scarcity • Flood management • Administrative barriers • Weighting and Scoring • Equal weighting for each criteria • Yes/No scoring

  5. Catchments (CAMS)

  6. Catchments (WR licensing)

  7. Catchments (HWM)

  8. Administrative Boundaries • Environment Agency Areas • County Council • District Council • Water Company (not zones) • Score; Yes/No • Equal weighting to other 4 criteria

  9. Catchment Characteristics • Area • River system • Aquifers • Urban/rural mix • Planned Development

  10. Catchment Characteristics • Area (difference from mean) • River system Lark and Kennet

  11. Catchment Characteristics • Aquifers (unconfined)

  12. Catchment Characteristics • Urban/rural mix • Planned Development

  13. Water Dependent Environments • SSSIs • European Sites • RSA/NEP Actions • Support boreholes

  14. Water Scarcity • No of Abstraction licences • Storage for Spray Irrigation • Abstractor Groups • Resource Scarcity

  15. Water Scarcity • No of Abstraction licences • Storage for Spray Irrigation • Abstractor Groups

  16. Water Scarcity • Resource Scarcity

  17. Flood Management • In river structures • Zone 3 flood risk area • Properties at risk • IDBs

  18. Flood Management • IDBs

  19. Other Possible Considerations • Existing measures (eg. SUDS) • On-going/planned work, eg. • Shoreline Management Plans • FCRM Structure Review Programme • Interested Parties eg. • River Groups • RSPB

  20. Results

More Related