1 / 14

Javier Cuenca Florida - Project Phase For Business Analyst

Here in this article, we will focus on empowering better performance and professionalism in business analysts. So regarding these basics of project phases for business analysts must be known and it may be useful to read. Different aspects of a technology project achieve specific outcomes and here, business analysts play a very important role.

Download Presentation

Javier Cuenca Florida - Project Phase For Business Analyst

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Javier Cuenca Florida - Project Phase For Business Analyst

  2. Here in this article, we will focus on empowering better performance and professionalism in business analysts. So regarding these basics of project phases for business analysts must be known and it may be useful to read. Different aspects of a technology project achieve specific outcomes and here, business analysts play a very important role.

  3. Today, if we look around ourselves technology is governing our world. Since we wake up in the morning till the time we get back to take a nap at night all over is ruled by technology. If technology is involved the role of a business analyst is appreciated. Anyplace we combine process, people, and technology there will be a problem.

  4. No business analyst works without any impact of technology involved in his project or process. So whenever you are confused then you can understand the things by Javier CuencaFlorida,a business analyst,and consulting viewpoint simply and differently from the phases of the functional project that involves technology.

  5. DO A BUSINESS ANALYST ACTIVELY INVOLVED IN THE PROJECT SUB-PHASE? In the consulting world, the business project that involves technology is split into 2 phases. The phases are different, the first one is scoping and the other one is Delivery. And these large phases contain more multiple sub-phases in which business analysts play a very important role. 

  6. The sub-phase of the scoping of a project phase is usually split into the Definition, Analysis, and Functional phase. And the sub-phases of the delivery of a project phase generally are parted in a way that this assignment includes Technical Design, Construction, Test phase that includes User Acceptance testing and System Integration Testing. So, here Javier CuencaMiami,a business analyst will share some of the phases:

  7. Scope Definition: Here the scope definition is the factor that has to be completed before the project business analyst being assigned the project. In some of the projects, a business analyst has to take initiative and has to complete this phase on his own. But most project managers and the subject matter expert play a vital role in this phase and some cases it is also called blueprinting.

  8. Analysis: Again in this phase, you have to analyze everything that is gathered in the first phase. And here business analysts have to actively take part in the project. Here an analyst has to start analyzing and gathering the requirements whatever is needed and he cannot miss the documents or any data, he has to be confident and focused.

  9. Functional Design: The design phase has split into two phases: functional and technical. In this phase, the elements are designed concerning the data flows, mapping, functions that can be met throughout the design and will be documented.

  10. Technical Design: The name only suggests everything that this phase is related to technology which defines the system and will meet the business requirements documented by the analyst. While the functional part implements the design, the technical part sticks to the technology.

  11. Construction: A business analyst might not play an important role in this phase of the project but it certainly doesn’t mean that he will move to another project or have relaxation time. In this phase, the IT team plays a vital role and they work in this phase and analysts may be required to support the testing preparation along with the project manager.

  12. Testing: Testing is also split into two sub-phases as discussed above. And testing is always done in the server environment out of the real-time production. SOURCE CREDIT : https://javiercuencabusinessanalsyt.blogspot.com/2021/05/javier-cuencas-project-phase-for.html

  13. THANK YOU FOR WATCHING

More Related