1 / 9

MTAC Workgroup #115 FSS Mail Prep and Entry

MTAC Workgroup #115 FSS Mail Prep and Entry. Krista Finazzo, Postal Co-Chair Joe Schick, Industry Co-Chair January 2008. Status. Last telecon January 14 January 28 met at Dulles Plant Discussion and FSS tour. Focus. Create lowest-combined-cost system

Download Presentation

MTAC Workgroup #115 FSS Mail Prep and Entry

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MTAC Workgroup #115FSS Mail Prep and Entry Krista Finazzo, Postal Co-Chair Joe Schick, Industry Co-Chair January 2008

  2. Status • Last telecon January 14 • January 28 met at Dulles Plant • Discussion and FSS tour

  3. Focus • Create lowest-combined-cost system • Match mail preparation requirements to FSS processing needs • Manage impact on mailer’s processes • Maintain sufficient pallet volume • Enable future growth of flats mail

  4. Preparation for Optimal Induction • FSS scheme bundles • Auto-ready FSS pallets

  5. Bundle Preparation • FSS scheme, combining carrier route • Straps only • No counter-stacking • Bundle thickness to maximize mail into ACTs

  6. Pallet Preparation • Bypass APPS • Enable auto induction • FSS auto-ready pallets • More efficient manual FSS prep • Maintain sufficient pallet volume

  7. Pallet Preparation Concepts • One FSS sort-scheme • Multi-FSS sort-schemes • All sort-schemes for one FSS machine • All FSS sort-schemes • All sort-schemes for all FSS machines

  8. Pallet Test Auto-Ready Finished Product

  9. Workgroup Status • Telecon in February • Begin to develop recommendations • Evaluate next steps

More Related