MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau

MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau. Work carried out so far: Design audits: Beam line & target (needs further revision) Fibre tracker (TRD to be modified to insert book marks) Cherenkov 2 (complete)

jirair
Download Presentation

MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau

  2. Work carried out so far: Design audits: Beam line & target (needs further revision) Fibre tracker (TRD to be modified to insert book marks) Cherenkov 2 (complete) Iron Shielding (TRD to be modified to insert bookmarks) Safety audits: Cherenkov 2 (Done) Iron Shielding (Done) Beam line & target (needs further revision)

  3. Work expected to be done before the next MICE Collaboration Meeting: Design audits: Engineering infrastructures Safety audits: Engineering infrastructures Fibre trackers

  4. Example of the work done so far: For the table summarising the work done to date, click: http://www.physics.ox.ac.uk/design/MICE/mice_design-safety_page.htm For the example on Cherenkov 2 Design audit, click: on the corresponding box in that table.

  5. Action list • So far we have only received fed back from Ghislain on the Cherenkov 2 and the magnetic shielding design. • We need the following urgently: • A schedule with milestone dates on the PID components so that we can work out a realistic time table for the Design & Safety review on components: • Cherenkov 1; • TOF 0, 1 & 2; • Calorimeter • We also need to have a common design on the support structures on alll the PID components. Paul has asked me to initiate this and I would like to have the endorsement of this group before I can make a start.