Next steps for the operation of the AD-Horn test-bench

Summary of work performed since the last meeting, focusing on test-bench safety, new equipment installation, stripline replacement, and horn instrumentation. Also discusses test-bench monitoring and future plans.

jruiz
Download Presentation

Next steps for the operation of the AD-Horn test-bench

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Next steps for the operation of the AD-Horn test-bench 6th AD-Target Consolidation Meeting Aurelio DE MACEDO (EN-STI-TCD)

  2. Summary • Work performed since last meeting • Test-bench safety (EN-STI, EN-DHO, HSE-OHS) • New equipment installation (EN-STI) • Stripline replacement • New multicontact LA-CUDD • Horn instrumentation with optic fibre strain gauges (EN-SMM) • Test-bench monitoring A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  3. Test-bench safety • Procedure for test-bench operation (EN-DHO, EN-STI, EDMS 2010160) • Procedure to turn power ON after a lockout • Access procedure with electrical lockout • Procedure for special access with power on the test-bench • Requirements for special access with power on the test-bench (HSE-OHS) • Authorized people: EN-STI-TCD, TE-ABT-EC • H0-B0 habilitation • No contact: 60cm distance from conductors A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  4. Test-bench safety A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  5. New equipment installation • Equipment replacement on November 16th (EN-HE, EN-STI) • Prepare future cycling testing • Have new version of equipement • Test new multicontact LA-CUDD A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  6. New equipment installation • Stripline installation Stripline link Stripline Stripline transport trolley A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  7. New equipment installation • New multicontact LA-CUDD • Installed on the stripline link (interface between junction box and stripline) A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  8. New equipment installation • New multicontact LA-CUDD • Installed in old design clamp (new clamp mechanism is being tested separately) Old design clamp New jaws New jaws design equipped with LA-CUDD A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  9. Horn instrumentation • New instrumented horn with optic fibre strain gauges (EN-SMM) • Glued and tested • Assembly on the sandwich line in December 2018 • Will be used on the test bench in 2019 A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  10. Monitoring • Measurements to monitor (non-exhaustive list) • Pulses (number since beginning, repetition rate) • Current and tension (total, max measured) • Waveform (with interlock) • Temperatures (horn, clamp, air flow) • Strain (max, dominant modes frequencies) • Monitoring interfaces • Timber, IPOC : a lot of information already present • Swan: process Timber data • Inspector : idea of a new online interface for real time data processing A. DE MACEDO - Test-bench operation - 6th AD-Target Consolidation meeting

  11. Thank you for your attention !