An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of 4Gbps connectivity for Nordic-MERLIN fringe tests John Conway, EXPReS Progress meeting, Utrecht, Jan 29th, 2008

  2. Overview • Fringe test at 1.3cm using Onsala 20m – Jodrell eMERLIN correlator autumn 2008 • Jodrell-Metsahovi to do digital electronics firmware – Onsala to provision link for 4Gbps test to eMERLIN, main deliverable fringes • Positive response on LOFAR station funding, build in 2008 need general LOFAR/eVLBI solution • Simon Casey has joined us from 1st Jan paid by EXPReS/FABRIC

  3. Hardware • 1 iBoB and 1 iADC delivered November, woken up. • Ordered HP switch (HP6400cl, 6 xCX4 ports plus 2 optical ports) same as Metsahovi) - allow CX4 conversion into Ciena box and multiple devices connected. Delivery next week. • Also can borrow Jb CX4-10G converter as backup (but may need LR-XFP).

  4. Chalmers Multi mode digital 20m Analog over fibre Single mode digital 10G lightpath 1G General traffic 1G switched VLBI Coax iADC VLBI’ Mk5 New Offices iBoB 25m CX4 HP6400cl Switch Ciena LR-10G LR-10G CX4 LOFAR PC+10G card Onsala Local Network plan November 2007 General Obs traffic

  5. Discussions with SUNET/NORDUnet • F2F Meeting end of October in Copenhagen, successful, discuss lightpaths, switched and ‘switched lightpaths’ • 10G lighpath equipment installed at Onsala and Chalmers first week of November, send signals over our dark fibre to Gothenburg then over academic networks. Equipment supplied by SUNET, no cost to us while in test phase. • Set up test from PC in Stockholm over NORDUnet and GEANT2 provisioned lightpath to UK. PC delivered from R Hughes-Jones before Christmas. • Second meeting Stockholm 15th January 2008, decide to work toward ‘final solution’ to allow both EXPReS needs and Onsala LOFAR needs. .

  6. Proposal after the meeting 2008-01-15 FUNET Rest of FUNET SUNET Rest of SUNET ?? NORDUnet routed IP (simplified view) SUNETproject router Metsähovi Onsala NORDUnet TSS Opto NetNorthWest CSC STO Probably to Hamburg on NORDUnet and Surfnet cross border link Jodrell Bank TSS L2 Cloud AMS JANET CPH VLANs GÉANT2 SurfNET LOFAR etc.

  7. Implementation plan

  8. Test schedule/Timeline • Envision PC (Onsala) to PC (UK, London or Jodrell), by end of Feb. UK Destination depends on JB 10G timeline. Recent progress on provisioning cross UK connectivity. • Then iBob to PC, iBOB to iBOB tests, Onsala-Jodrell and also Onsala –Metsahovi • Work needed on ensuring accurate timing info gets on packets. • Once new NORDUnet infrastructure in place (early March), can do tests at 1024Mbit/s to JIVE correlator over our 10G ‘routed lightpath’ via Amsterdam. • Above important for Onsala for pioneering LOFAR lightpath connectivity to Groningen. • Final timeframe for 4Gbps FABRIC fringe tests depends on delivery of eMERLIN correlator – and progress at ‘receive end’