An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RURAL ELECTRICITY ACCESS KENYA Project Concept and Introduction August, 2007 GREENPOWERKENYA

  2. OVERVIEW OF OPERATIONAL AREA IN KENYA Location*: • The projects are located in Central Province, at the Southern face of Mount Kenya (see map) • Accessible via Kianyaga town, a 3.0 hour car ride from Nairobi. Population and Demographics: • Total beneficiaries estimated at 50,000 people with an average of 5.0 persons per household; average population density at 550 per square-km. • 17 CBO’s with 1000 household membership identified with (see box in left-bottom corner) • Life expectation is relatively long at 65 years; no accurate data available on HIV status within the operational area. Project Sites Economics: • Small farmers with an average of 1 acres per household • Most households are within the tea- and coffee zone and produce tea, coffee, maze, beans, banana’s and hold cattle cows and chicken • Average income per household is 800-900 USD per year Representation of a 1,000 HH community Education: • 80-90% completed primary education • 50-70%completed secondary education 100 kW generation 200 HH village Connectivity: Transformer • Less than 4% of the households electrified • Telecommunication networks cover the area. • 50% has access to water for domestic usage Radius = 7km * Project locations include Kirinyaga District, Embu District

  3. PROJECT MISSIONS AND GOALS Create local governance mechanisms based on collaborative social- and economic values. Self - Governance Generate monetary assets (power plants, distribution systems and factories) which provide access to formal credit markets and centralize development initiatives to a local level. Hard Assets Elements for Sustained Development Manifest business- and management expertise to operate and maintain commercial enterprises. Social- and economic capacity building via scale-up initiatives. Technical Capability Create decentralized social investment opportunities (i.e. education facilities and infrastructure) through the control and isolation of fund channels which are presently inefficient (kerosene, candles, battery charging) Community Investments

  4. A THREE-PHASE APPROACH PHASE I: PILOT PHASE II: ROLL OUT PHASE III: ENHANCE Self - Governance Technical Capability Community Investments Goals / Milestones: • Filtered governance structure translates and expands itself through co-operative relations with succeeding CBO’s. • Cooperative of Independent power producer- and distributors • Agreement, community contribution and post-valued labor create sustainability and filter governance structures. • Independent Power producer- and distributor. • Cooperative supports expansion and replication. • Social investment committees support education, infrastructure, social welfare and health programs • Electricity cooperative • 2 MW generation plant • 10 100KW commercial platforms • Private grid extension. • Ten 100kW-1000 connection facilities. • 2 MW plant prime structures • Design of commercial platforms • 10 prime structures of 100kW generation facilities • One fully operational 100kW-1000 connection project. Hard Assets • In-house capacity to design, produce and install MW energy pilots. • Training and maintenance programs. Operation and management programs. • In-house capacity to design, produce and install energy pilots, controls and distribution networks • In-house know-how and expertise to design and construct prime structures. • Business management basics • Establishment of social investment committees which govern development initiatives • Awareness of economic structures and access to credit markets. • Locally governed development initiatives

  5. ORGANIZATION STRUCTURE • Local Board - 2 • Local Board - 1 • 10 Elected Community Representatives • 10 Elected Community Representatives • Social Investments Committee • Social Investments Committee • Operations Committee • Operations Committee • 4 Full-Time (Paid) Staff Supervised by the Board • 4 Full-Time (Paid) Staff Supervised by the Board • 3 Representatives Appointed by the Local Board • 3 Representatives Appointed by the Local Board • Management • Management • Collections • Collections • Engineering • Engineering • Finance • Finance • 1,000 HHs • 1,000 HHs • HH 1 • HH 1 • HH 2 • HH 2 • HH 3 • HH 3 • Green Power LTD Executive Board • Local Partners: • GreenPower – NGO • Sintronics (Control Systems) • Numerical Engineering (Turbine Manufacture) • 1 Representative from each Community - Total of 70% • Robert Mutsaers and Nyaga Ndiga– Total of 30% • 10 – 17 Local Boards

  6. TIMELINE PHASE I: PILOT PHASE II: ROLL OUT PHASE III: ENHANCE • TODAY 2004 2005 2006 2007 2008 2009 2010 2011 2012 • Green Power LTD: Robert and Nyaga • TARDA grants 35k Euro • Finalization of MW generation plant and commercial platforms • Robert selected as Echoing Green social entrepreneur fellow • Start prime structures for 2 MW generation, commercial platforms, and micro-hydro manufacturing shop • First primary structure completed • Primary structures completed in 3 sites; 7 others are underway • First 100kW generators successfullytested • Interconnect grids and connect to MW generation plant • All 10 projects are finalized • 3 more projects are finalized, 6 are pending mini-grids • Liberty grants 30k Euro for finalization of pilot generation project • Completion of first mini grid and pilot • French embassy granted 50k Euros for finalization of pilot distribution project • Construction of MW plant and commercial platforms

  7. PHASE I: Ten prime structures and one 100KW-1000 connection Model Total financing need for Phase I forecasted: 300 Thousand USD Goals / Milestones: Financing : • Agreement, community contribution and post-valued labor create sustainability and filter governance structures. • Independent Power producer- and distributor. 100KW-1000 Connection project Self - Governance • Prime structures • 100KW generation • Control units • Mini Grid • Transformers and switch gear • 10 prime structures of 100kW generation facilities • One fully operational 100kW-1000 connection project. Hard Assets Capacity building • Weekly lectures with local communities • Technical training of local skilled laborers • Theoretical training at polytechnic Kenya • Evaluation Study COMPLETION EXPECTED AS OF NOVEMBER 2007 • In-house know-how and expertise to design and construct prime structures. • Business management basics Implementation Technical Capability • Post valued labor agreements towards finalization of Prime structures and core distribution network • Post valued labor agreements installation generation pilot and controls. • Post valued labor design, construction, assembly and installation of generation and distribution systems. • Land allocation and license agreements • Investment return agreements • Awareness of economic structures and access to credit markets. Community Investments

  8. PHASE II: nine 100KW-1000 Connection projects and MW-Prime Structures Capacity building • Weekly lectures with local communities • Technical training of local skilled laborers • Theoretical training at polytechnic Kenya • Evaluation study Total financing need for Phase II forecasted: 3 Million USD Goals / Milestones: Financing : • Filtered governance structure translates and expands itself through co-operative relations with succeeding CBO’s. • Cooperative of Independent power producer- and distributors Nine 100KW-1000 Connection project Self - Governance • Prime structures, 100KW generation • Control units, Mini Grid-1000 Connections • Transformers and switch gear MW-Prime structures and commercial platforms • Prime structures • Commercial platforms • Ten 100kW-1000 connection facilities. • 2 MW plant prime structures • Design of commercial platforms Hard Assets • In-house capacity to design, produce and install energy pilots, controls and distribution networks Technical Capability Implementation • Post valued labor agreements of Generation plants, distribution networks, MW-prime structures and commercial platforms • Post valued labor installation generation pilot and controls. • Post valued labor GP, design, construction, assembly and installation of energy systems and commercial platforms. • Land allocation and license agreements • Investment return agreements • Establishment of social investment committees which govern development initiatives Community Investments

  9. PHASE III: 2MW Generation Plant, Substation and Ten Commercial Platforms Capacity building • Weekly lectures with local communities • Technical training of local skilled laborers • Theoretical training at polytechnic Kenya • Evaluation study Goals / Milestones: Financing : • Cooperative supports expansion and replication. • Social investment committees support education, infrastructure, social welfare and health programs • Electricity cooperative Ten 100KW-Commercial platforms Self - Governance • Structures • Equipment MW-Generation Installation • Generation pilots and controls • Substation and high voltage feeding line • Interconnection of isolated grids • 2 MW generation plant • 10 100KW commercial platforms • Private grid extension. Hard Assets • In-house capacity to design, produce and install MW energy pilots. • Training and maintenance programs. Operation and management programs. Technical Capability Implementation • Post valued labor agreements of Generation plants, distribution networks, MW-prime structures and commercial platforms • Post valued labor installation generation pilot and controls. • Post valued labor GP, design, construction, assembly and installation of energy systems and commercial platforms. • Land allocation and license agreements • Investment return agreements • Locally governed development initiatives Community Investments Total financing need for Phase III forecasted: 9 Million USD

  10. FINANCIAL- AND OTHER PARTNERS PHASE I – 2005 - Jun 2008 Organization Type Amount Purpose • Local communities (GP) • Equity Investment $100k • Feasibility, Prime structures and skeleton network • Netherlands Embassy • Grant $25k Euro • Workshop Financing 100KW project • Liberty • Grant $20k Euro • 100KW Generation Facility • TARDA* • Grant $35k Euro • 100KW Generation Facility • Liberty • 0% Loan $100k Euro • 1000 connection Mini-Grid • French Embassy • Grant $50k Euro • 1000 connection Mini-Grid Organization Duration Purpose • Green Power (NGO) • Over 2 years • Organizational structuring Training / Consulting • University UQAM/ CAN • Over 2 years • Evaluation and impact assessment • Green Power (NGO) • Over 1 year • Technical- and maintenance • Linklaters • Over 2 years • Legal Assistance * TARDA = Tana and Athi River Development Authority, Kenya

  11. FINANCIAL- AND OTHER PARTNERS PHASE I – 2005 - Jun 2008 Organization Type Amount Purpose • Local communities (GP) • Equity Investment $100k • Feasibility, Prime structures and skeleton network • Mlinda Foundation • Support for Workshop and construction of Prime Structures. (Under negotiation) Financing nine 100KW projects Total Need: Euro 3 m • Liberty • Support nine-1000 connection Distribution networks (Under negotiation for interest free loans) • Support nine 100KW generation installations and substations (Under negotiation for grant support0 • GTZ • NRECA • Capacity building (Under negotiation Pro-Bono assistance) • Good Energy • Support nine 100KW/1000 connection projects (Under negotiations for low interest loans) • ACUMEN Fund • Support nine 100KW/1000 connection projects (Under negotiations for low interest loans) Organization Duration Purpose Training / Consulting • Continuous • Technical capacity building • Green Power (NGO) • NRECA • 3 Years • Capacity building • One year • Legal assistance • Linklaters • University UQAM/ CAN • Over 2 years • Evaluation and impact assessment

  12. COLLABORATION IN PHASE II – TO BE FINALIZED BY END OF 2009 Organization Type Amount Purpose • Local communities (GP) • Equity Security • Mlinda Foundation • Support Commercial Platforms. (suggested) Financing Total Need: Euro 10 m • Liberty • Support High voltage feeding line. (Suggested) • Support MW power plant. (Suggested) • GTZ • NRECA • Capacity building (Under negotiation Pro-Bono assistance) • USAID • Support MW Generation Plant and commercial platforms. Suggested) Organization Duration Purpose Training / Consulting • Continuous • Technical capacity building • Green Power (NGO) • NRECA • 3 Years • Capacity building • One year • Legal assistance • Linklaters • University UQAM/ CAN • Over 2 years • Evaluation and impact assessment