1 / 8

Wandering Ambassador

Justin Akerman (CE ) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME ) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel. Wandering Ambassador. Project Description. Mission

kagami
Download Presentation

Wandering Ambassador

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Justin Akerman (CE) Chris Hoerbelt (ME) HershAnand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel Wandering Ambassador

  2. Project Description Mission • Integrate existing hardware with newly designed subsystems to deliver functional prototype ready for software development Key Objectives • Debug I2C communication interface • Design & integrate sensor circuitry • Design & Implement redundant safety features • Design simple transport mode • Incorporate ride vibration mitigation • Fabricate and assemble prototype • Modify electronics to address known issues

  3. Design Concept • Modularity • Fully modular bolted connection architecture • Enclosure • Transparent & water resistant electronics box • Safety • Chain guards • Emergency stop buttons • Bumper System • Sensor Suite • Sonar • Infrared • Bump • Photodiode • GPS • Accelerometer • Moisture sensor • Temperature • Motor Encoders • Transport • Collapsible handle • Drivetrain disengagement

  4. Design Concept: Electronics Architecture High Level Control / Decision Making Input / Command Interpretation Input / Output Devices

  5. Critical Risk Assessment • Risk: Difficulty producing I2C functionality • Hardware and software incompatibilities and flaws produced multiple roadblocks • Roadblocks pushed back electrical & test schedules • Learning curve for electronics system very steep • Mitigation: Investigated alternate beagleboard OS • Mitigation: Replaced I2C hardware to ensure proper configuration • Mitigations were unsuccessful for an extended period – required revising of project goals

  6. State of Project • Design meets all customer needs • Mechanical systems complete on schedule • Motors and water pump function as designed • Electronics 2-3 weeks behind schedule • Multiple issues encountered • Hardware issues • Software incompatibility • Cost: $500 under budget

  7. Future Direction • P11216 team has received customer and P11215 input on feature addition and optimization • Water based vandal deterrent system • Optimization of sonar placement and actuation • Design and implementation of personality software • Plant expansion system • LCD placement & function plan

  8. Questions