1 / 13

Eurocode 1: Actions on structures –

Eurocode 1: Actions on structures –. Part 1–2: General actions – Actions on structures exposed to fire. Annex E (informative) Fire load densities. Part of the One Stop Shop program. Introduction. Fire load density evaluation FLD used is a “design value” based on Measurements or

kairos
Download Presentation

Eurocode 1: Actions on structures –

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eurocode 1: Actions on structures – Part 1–2: General actions – Actions on structures exposed to fire • Annex E (informative) • Fire load densities Part of the One Stop Shop program

  2. Introduction • Fire load density evaluation • FLD used is a “design value” based on • Measurements or • Values given in national regulations • Determined by • Classification of occupancies and/or • Individual project analysis

  3. Design value • The design value of the fire load: Fire activation risk factors for Characteristic fire load density per unit floor area Compartment size and Type of occupancy Fire-fighting measures risk factor Combustion factor

  4. Determination of fire load densities • Fire load density needs to be determined taking into account • Type of building / occupancy • Protected fire loads • Calorific value of fuel • This process is used to determine the value of for previous equation

  5. from occupancies • For a large number of buildings, e.g. offices, residencies, hotels, and the paper industry, In which case, Table E.4 may be used to determine the value of • Separate fire load densities within the building should be added to the tabular value if necessary

  6. from basic principles • To obtain we must obtain a value for Compartment area Characteristic fire load Optional factor for protected loads Net calorific value Amount of combustible material

  7. Combustion factor • Having determined a value for we next need a value for - the combustion factor • The value of 0.8 is taken for cases mainly consisting of cellulosic fuels • In other cases the combustion behaviour should be looked at as a function of occupancy and type of fire load

  8. Fire activation risk factors • Due to size of compartment: • Due to type of occupancy: The factors vary from just under 1.0 to just over 2.0 – the particular value used is taken from Table E.1 included in the Annex

  9. Fire-fighting measures risk factors • This factor is a function of active fire-fighting measures • Takes into account • Fire suppression systems • Automatic fire detection and alarm systems • Manual fire suppression systems • The values for the individual factors are given in Table E.2

  10. Worked example • Work out the design fire load for a 6,500m2 office space, with no additional fuels present in the space. • The office is sprinkler protected • Heat detectors are the only source of A&D system within the space • No other special provisions are present apart from the normal fire-fighting measures

  11. Worked example - workings • From Table E.4, we can see the value of can be taken as 420 MJ/m2 • This value may be taken because the value of is 1.0 (Table E.1) • The value of can be taken as 0.8 • The value of is 2.0, as it is between the 5,000 and 10,000m2 brackets (Table E.1)

  12. Worked example - workings • The value of is therefore averaged from 0.61, 0.87, and 1.0 which results in having a value of 0.83

  13. Worked example - answer • Putting these values back into the original equation gives us a design value of the fire load for our test case scenario highlighted in the worked example as: MJ/m2

More Related