X-Ray WFI Mission Study Summary

X-Ray WFI Mission Study Summary. Team Lead Mark Steiner 16 – 20 April 2012. X-ray WFI Presentation Timeline. MDL Mission Study Summary. MDL developed mission concept for Wide Field Imager configuration, based on customer inputs MDL team presented formal , final report out to customer team

kaleb
Download Presentation

X-Ray WFI Mission Study Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-Ray WFI MissionStudy Summary Team Lead Mark Steiner 16 – 20 April 2012

  2. X-ray WFI Presentation Timeline

  3. MDL Mission Study Summary • MDL developed mission concept for Wide Field Imager configuration, based on customer inputs • MDL team presented formal, final report out to customer team • Presentations were reviewed by MDL team for internal consistency on Thursday

  4. Mission Summary – Final Orbit parameters – L2, 800,000 km Lissajous LV – EELV Launch date – 1/1/2021 Mission Lifetime – 3 year minimum / 5 year goal Mass estimate – payload: 94.2 kg (3 @ 31.4 kg each) (Instrument), 1079 kg (3 @ 360 kg each) (X-Ray Mirror) – 1173 kg total Power estimate – payload: 74 W total (Instrument) , 300 W (X-Ray Mirror) – W total Mission class – B Disposal plans – Same as Grating Mission (1 m/s delta-V at EOL) Study name: MDL X-ray Grating WBS: 244904.04.10.01.02 ”MDL X-ray WFI” in remarks

  5. MDL Areas of Concentration/Study Drivers Possible Trades No system level trades identified or worked • Increase slew rate to 60 degrees in 30 minutes rate without driving ACS or Power system? • Field of regard: 30 deg pitch minimum, capture impact if go to 45 deg

  6. Study Plan for the week • Monday AM: review study expectations and identify key issues PM: 1) define ConOps 2) discuss derived subsystem requirements and ask questions • Tuesday AM: System drivers – TBD subsystems PM: Rest of subsystems • Wednesday AM: I&T Flow, Mission Ops PM: Presentation preparation • Thursday AM: Check presentations for consistency PM: Finish presentations • Friday Presentation with customers, including remote customer team • Monday following 1) Lessons learned, process improvements, lab status, etc. 2) Finalize presentations and wrap up the study

  7. X-ray WFI Mission Level Schedule Period 4 (3 months) Period 5 (36 (+24) months) Preliminary Design Final Design Mission Cleanup Bus & P/L Fab/Assy/Test Payload Primary (+ extended) Ops Bus & P/L I&T System Definition Prep for Launch Launch & Checkout Phase B Start 8/8/2016 CDR 5/1/2018 PDR 7/1/2017 Project Start 8/8/2014 Phase C Design Phase B Definition Phase A Preliminary Analysis Period 1 (24 months) Mission Definition 10months 24 months 11months Launch 1/1/2021 On-station L2 4/1/2021 Disposal 4/1/2026 Period 3 (9 months) NOTE: 28 day months for scheduling prior to launch Period 2 (25.5 months) Period 6 (3 months) Phase D-1 Subsystem Development and Spacecraft Integration and Test Funded Schedule Reserve 7 mo. Phase E/F Operations Phase D-2 Launch & Checkout Period 5-1 (1 month) 14mo 9.5mo 2.5mo 63 months 32months 3months