An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION Connecticut's Nitrogen Trading Program To achieve the TMDL for Long Island Sound

  2. Initial TMDL Allocations2000 Starting Point The initial loading to Long Island Sound from all municipal facilities combined was established in the draft TMDL at: 48,709 lbs/day

  3. Final TMDL Allocations2014 Ending Point The TMDL requires the loading to Long Island Sound from all municipal facilities combined be reduced to: 17,774 lbs/day

  4. 100 80 100 100 20

  5. 0.17 0.14 0.32 0.19 0.46 0.18 0.93 1.00 0.11

  6. 2000 2014 15% 15% Flow Load Each facility was allocated a percentage of the total statewide TMDL loading equal to their percentage contribution to the statewide current discharge flow rate

  7. Traditional NPDES Implementation: • Your Pipe • High Compliance Cost • Your Permit • High Non-Compliance Cost • Your Problem • Rewards The Last Difficult to Implement

  8. Alternative Trading Implementation: • Our Pipe • Lower Compliance Cost • Our Permit • Lower Non-Compliance Cost • Our Problem • Rewards The First Incentive to Provide Treatment

  9. 100 50 80 40 20 100 50 40 10

  10. 100 80 20 100 40

  11. Public Act 01-180 An Act Concerning Nitrogen Reduction In Long Island Sound • Authority to Issue a General Permit • Establish a Nitrogen Credit Advisory Board • Provides for an Alternate Compliance Program

  12. General Permit for Nitrogen Discharges • Places all POTWs in Connecticut under one nitrogen bubble • Provides total nitrogen effluent limits over 15 years • Allows for a alternate compliance schedule

  13. Establish a Nitrogen Credit Advisory Boardand a Credit Exchange Program to assist in implementation of the TMDL • Provides for a board of 12 members to establish the value of Nitrogen Credits • Board will assist in setting the compliance schedule (annual effluent limits) • Establishes an equivalency factor for each POTW • Purchases and sells all available credits • Establishes a technical assistance program

  14. $1 Million Loanequals$61,160 / year

  15. How Costs/Credit are Calculated

  16. TMDL/WLA IMPLEMENTATION 50,000 40,000 /day) 30,000 lbs Nitrogen ( 20,000 10,000 0 2000 2001 2004 2007 2008 2010 2011 2014 2002 2003 2005 2006 2009 2012 2013 Year

  17. Total Nitrogen Loading, 2002-2003

  18. Buyers =Sellers

  19. 2002 vs. 2003 ProjectionEOP and EQ