1 / 12

PMP Practice Test Dumps

Thinking of taking Project Management Professional? But afraid that rumors are true and youu2019ll fail. Worry days are over when you have an excellent PMP Dumps Questions resource what are you doing being all anxious? Just visit Knowledge4sure now to get your set of affordable and latest PMP Dumps. Knowledge4sure has made sure that PMP Exam Questions Dumps are according to the latest content of PMI Project Management Professional. Make the best preparation for Project Management Professional Certification Exam with two impressive formats PMP Dumps PDF and Online Test Engine. Studying for certification exams was never this easy. Visit the link below to get more insight. https://www.knowledge4sure.com/PMP-exam-questions.html

Download Presentation

PMP Practice Test Dumps

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PMI PMP Project Management Professional

  2. Knowledge4sure.com How To Pass How To Get This Exam How To Prepare 2

  3. Hello! Visit Knowledge4sure.com To Solve Yours Problems 3

  4. PMI PMP Sample Questions Answers PMP Exam Questions PMP Exam Dumps

  5. PMP Questions Answers QUESTION: 1 Which of these is not an approved Estimate Activity Durations technique? A. Three Point Estimating B. Parametric Estimating C. Analogous Estimating D. Critical Path Estimation Answer: D 5

  6. PMP Questions Answers QUESTION: 2 If you are working on a project where there is no definite project detailed scope, but similar projects have been completed in the past, what is the correct Estimate Activity Durations tool to use? A. Analogous Estimating B. Parametric Estimating C. Critical Path Estimation D. Three Point Estimating Answer: A 6

  7. PMP Questions Answers QUESTION: 3 You have been called in to give an executive presentation on the status of your project. Just before you walk into the meeting, you are informed that a critical resource for the project is no longer available, and could result in a substantial delay to the project. However, you believe there may be an alternative resource that could be used. What do you tell the executive committee? A. Wait until you have all facts before you advise the executive team. B. Ask your deputy project manager to add this to the risk database, but do not mention it to the executive team. C. Advise the executive team of the situation exactly as you know it to be at that moment. D. Do not mention it to the executive team because you know that you have enough reserve to support a 2 month delay. Answer: C 7

  8. PMP Questions Answers QUESTION: 4 In a cause and effect diagram, which of these is not a potential cause? A. Personnel B. Problem statement C. Time D. Material Answer: B 8

  9. PMP Questions Answers QUESTION: 5 Which of the following is inaccurately represented by the term Progressive elaboration? A. Changes to project scope B. Rolling wave planning C. Detailing out the product requirements which were developed during the initiation process. D. Production of fabrication and construction drawings from the design drawings for a chemical plant. Answer: A 9