1 / 15

GAMBARAN PROGRAM KB NASIONAL PROV SUMBAR BULAN : JULI 2008

GAMBARAN PROGRAM KB NASIONAL PROV SUMBAR BULAN : JULI 2008. DISAJIKAN TANGGAL 26 Agustus 2008. PENCAPAIAN PB PER MIX-KONT JAN S/D JULI 2008. 1. 2. PB PRIA PER KAB/KOTA BULAN s/d JULI 2008. PESERTA KB AKTIF PER MIX- KONT BULAN JULI 2008. 3.

konane
Download Presentation

GAMBARAN PROGRAM KB NASIONAL PROV SUMBAR BULAN : JULI 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GAMBARANPROGRAM KB NASIONALPROVSUMBARBULAN : JULI 2008 DISAJIKAN TANGGAL 26 Agustus 2008

  2. PENCAPAIAN PB PER MIX-KONTJAN S/D JULI 2008 1

  3. 2 PB PRIA PER KAB/KOTA BULAN s/d JULI 2008

  4. PESERTA KB AKTIF PER MIX-KONTBULANJULI 2008 3

  5. TAHAPAN PIK-KRR PER KAB/KOTABULAN JULI 2008 4

  6. PERKEMBANGAN KELOMPOK UPPKSBULAN JULI 2008 5 TINGKAT PROPINSI SECARA NASIONAL SASARAN SASARAN POK UPPKS POK UPPKS % % 1414 1.414 1.408 51.142 46.706 100,4 91,3 TINGKAT PROPINSI SECARA NASIONAL SASARAN SASARAN % % KPS KPS - - KSI BERUSH KSI BERUSH 26.622 1.200.000 17.611 983.229 66,15 79,6 20 76,60% 79,03% UPPKS 68,70%

  7. TINGKAT PROPINSI BKB AKTIF % SASARAN 36.026 30.395 84,37 6 KELUARGA PUNYA BALITA AKTIF KEGIATAN BKB

  8. 25 TINGKAT PROPINSI BKL AKTIF % SASARAN 6034 4686 77,66 7 KELUARGA PUNYA REMAJA AKTIF KEGIATAN BKR

  9. REALISASI PELAKSANAAN ANGGARAN PEMBANGUNAN DAN RUTIN BULAN : JANUARI S/D JULI 2008 8

  10. 9 ALOKASI ANGGARAN KE SKPD KB KAB/KOTA • PROG. KB = Rp. 1.078.295.000,- • PROG. KRR = RP. 659.400.000,- • PROG. PPKKB = Rp. 1.160.170.000,- • 4. PROG. KPK = Rp. 835.300.000,- • 5. PROG. P. SDM A = Rp. 229.800.000,- • 6. PROG. PKYB = Rp. 142.850.000,- • JUMLAH = Rp. 4.105.815.000,- 22,59 % DR JML ANGGARAN 40,52 % ANGGARAN PEMB.

  11. 10 PERSEDIAAN KONTRASEPSI JULI 2008 * Kab/Kota melapor 100 %

  12. 11 PERKIRAAN KEMAMPUAN PERSEDIAAN KONTRASEPSI JULI 2008

  13. KELEMBAGAAN SKPD KB KAB/KOTA KONDISI JULI 2008. 12

  14. 13 KETERANGAN : Realisasi Kelembagaan sesi PP 41 Th. 2007 Badan 15/19 = 78,95 %

  15. Sekian & Terima Kasih TERIMA KASIH

More Related