590 likes | 637 Views
Introduction. HPSEB's Grid is connected to NEW grid comprising of Northern Grid and rest of India except Southern Grid. The Total Load of the Grid is touching 30000 MW load and frequency and voltage related issues is endangering the safety and security of Grid. The Frequency in the Grid is hovering
E N D