1 / 11

Welcome to the 16 th GridPP Collaboration Meeting

Welcome to the 16 th GridPP Collaboration Meeting. Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline. Steve Lloyd, Chair of the GridPP Collaboration Board. GridPP3 Project Leader.

krysta
Download Presentation

Welcome to the 16 th GridPP Collaboration Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to the 16th GridPP Collaboration Meeting Introduction GridPP3 Project Leader GridPP3 Proposal Tier-2 Funding Timeline Steve Lloyd, Chair of the GridPP Collaboration Board

  2. GridPP3 Project Leader Having done the job for 6 years Tony Doyle understandably did not wish to continue for a further 3 years (or more). A ‘Search Committee’ was set up by the CB to find a successor (Peter Dornan, Pete Watkins, John Womersley and SLL). There was one ‘obvious’ candidate and a couple of possibilities. As recently announced Dave Britton will be the GridPP3 Project Leader (subject to PPARC approval and suitable financial arrangements between PPARC, Dave and Imperial). Congratulations (or commiserations) Dave! GridPP16 Introduction

  3. Proposal Procedure Apply for Grants Proposal Re-evaluation GridPP1/ GridPP2 Tier-1 £Am Tier-2 £Bm Middleware £Cm Applications £Dm Management £Em … Total £Xm Institute 1 £fm Institute 2 £gm Institute 3 £hm Institute 4 £im Institute 5 £jm … Total £YM Tier-1 £am Tier-2 £bm Middleware £cm Applications £dm Management £em … Total £YM Peer Review Proposal Allocate GridPP3 Institute 1 £fm Institute 2 £gm Institute 3 £hm Institute 4 £im Institute 5 £jm … Total £YM Institute 1 £Fm Institute 2 £Gm Institute 3 £Hm Institute 4 £Im Institute 5 £Jm … Total £XM Tier-1 £Am Tier-2 £Bm Middleware £Cm Deployment £Dm Management £Em … Total £Xm Peer Review Is this still a sensible project? GridPP16 Introduction

  4. Tier-2 Allocations • Take each experiment’s CPU and Disk requirements (from Dave Newbold) • For each experiment – share out among Tier-2s • For each Tier-2 share out among institutes • Sum over experiments (maintains the correct CPU/Disk ratio) Sharing guided by: • Size of local community (number of Ac/Ph/PP) • Past delivery (KSI2K to date, Disk usage last quarter) • Current resources available GridPP16 Introduction

  5. Tier-2 ‘Shares’ ~35% ~35% ~10% ~20% GridPP16 Introduction

  6. Example CMS Requirement in 2008 is1800 KSI2K and400 TB Tier-2 sharing matrix: (PMB/Tier-2 Board) (Part of) Institute sharing matrix: (Tier-2 Board) i.e Imperial ‘allocation’ is 1800 KSI2K (400 TB) x 0.75 x 0.9 = 1215 KSI2K (270 TB) GridPP16 Introduction

  7. Crosscheck: GridPP16 Introduction

  8. Hardware Costs (Agreed by CB) • Take requirement in following year 7560 divided by the lifetime in years (4.85 CPU, 3.9 Disk) = 1559 • Multiply by the unit cost in that year £0.392k/KSI2K = £612k • Similarly for disk. • Up to institutes how they spend it (new kit, replacement kit, power, central services … ) GridPP16 Introduction

  9. Similar procedure used to allocate manpower (by the Tier-2 Board) Crosscheck: GridPP16 Introduction

  10. Procedure • Dave Britton has sent an individual email to each PI with their manpower allocations (including MSN and other posts) plus their nominal hardware allocation (if they want it) • Each institute should apply for these resources via JeS • Preparing a further email about JeS details • We assume Hardware Support posts attract fEC • No explicit running costs (‘Can of Worms’) GridPP16 Introduction

  11. TimeLine 2006 2007 2008 GridPP3 GridPP2 GridPP2+ GridPP3 Proposal Submitted July 13 End of GridPP2 (31 August 2007) Start of GridPP3 (1 April 2008) 14TeV LHC: 900GeV Now (GridPP16) First LHC Collisions November 2007 14TeV LHC Collisions Spring 2008 GridPP16 Introduction