An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What Factors Should Be Considered While Installing Transformer - MiracleElectronics Just as much as transformers are important for bringing in the right amount of voltage fromone source to another, it is equally important to install the transformer in the appropriate environment. If there is any mistake in its installation, there can be many difficulties and safety hazards that can be faced. Incorrect installation may lead to fire or electric shock. So, before setting up and connecting a transformerin your premises, it is very important that you make a check on the followingfactors. Location One special consideration to be made in case of liquid-filled transformers includes their location. These transformers must be located in an area that matches up to the relevant fire hazard specifications. Moreover, they should be positioned in a way that there is no possibility of damage in case of aleakage. Ventilation In case of dry-type transformers, ventilation must be given a priority. There should be access to clean dry air and enough space should be allotted so that heat can dissipateeasily.

  2. Grounding The tank should be permanently grounded with a correctly sized and properly installed permanent ground after the transformer is placed. This is to be done even before further inspection is carried out and the unit isassembled. Wiring All the ground wires should be covered with plastic or wood molding at a point 8 feet above the base of the pole. Moreover, guy wires that are correctly installed can protect the pole line from damage caused by the strain of line conductors, pole-mounted equipment and severe weather conditions. Mounting Multiple transformers can be mounted on a single pole as long as the weight is evenly distributed throughout and the total weight is within the safe limits of the pole. Sub-100 kVA single phase transformers are mounted above the secondary mains. For transformers larger than 100kVA, platform/pad mounting isrecommended. Humidity In case of humidity or rain, lots of care is to be taken, especially with liquid-filled transformers. If the humidity exceeds 70%, dry air should be continuously pumped into the gas space for around 20-30 minutes before service personnel can enter thetank. FluidCheck In case of inspection, if the insulating liquid needs to be drawn down, you need to make sure all the equipment like containers, hoses and pumps used are clean and dry. If the equipment has been used for any other liquid before, clean all the contaminated items thoroughly before using. You must also have clean and dry storage options for retaining the liquid and also for filtering of the liquid before refilling the tank. Also remember that the liquid level should not go below the top of windings in the process of removingit.

  3. PressureMaintenance A positive pressure is required at all times, even at low ambient temperature. In order to allow this, sufficient gas pressure must be maintained. The pressure-vacuum gauge will show pressure variations with ambient temperature, which must be recordedregularly. Inspection If any work has been done inside the tank, all the electrical connections must be checked for tension, all bushings should be checked for tension of gaskets, and all draw lead connections should be checked too. Along with the electrical clearances, a check for the removal of all tools should be madetoo. You must remember that whatever amount of care you take but, if you don’t have a standard transformer, you are not completely protected against hazards. So, be sure to purchase a standard transformer to ensure safe electrical installation and reliable power supply. One such place where you can get the best transformers that are certified and qualified is Miracle Electronics, a leading transformer manufacturer in Indiasince the past 20years. For more information, please visit: Miracle Electronics