An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The difficulties of providing turnkey construction from the point of view of the contractor

  2. From the point of view of a turnkey contractor, I don’t think there is any sort of difficulties in providing turnkey construction. I would rather say that there are certain challenges faced. As in any other industry or service, the turnkey consultants may feel that certain processes and mechanisms put in place can be improved, productivity can be maximized tweaking even the little details.

  3. The challenges may be internal. For example,  turnkey contractors in the pharmaceutical industry looks after all the planning, execution, and commissioning of the plants. They procure equipment, manage construction, and even do documentation. As they are in charge of everything, there must be several challenges to completing the project on time. Maintaining the highest quality throughout. Moreover, there are stringent rules and standards like eGMP and GMP which are to be followed. There are local rules set by authorities that are meant to be met. Managers need to execute the plan in the right way.

  4. Externally, there is little to no interference from the client because the deal is already made. There are several core decisions that are made in the consultation and approval of the client. Like in the case of design, engineering details, and such factors, approval is sought. Other than these I am not aware of any such challenges. If there are more, I would love to know. Thanks. Hope the answer helps!

  5. Turnkey consultants