1 / 9

(~8/29)

送受信班進行状況. (~8/29). 冨永将大・川崎浩平・井山佳美. 全体像. AHL. 送受信システムの作成. 目標. 1 hour. Receiver(AHL 感受性 ). 1 hour. 4 hours…. Still inactive. 求められること. AHL. 5 hours…. ③ 出力量  を下げる. ①AHL 合成量(合成速度)  を下げる. ② 感受性  を下げる. ③RBS の   調整. ①RBS の調整. ② シグナル分子の変更. シグナル分子の変更. 《Cross talk を利用した実験 》.

lavi
Download Presentation

(~8/29)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 送受信班進行状況 (~8/29) 冨永将大・川崎浩平・井山佳美

  2. 全体像 AHL 送受信システムの作成

  3. 目標 1 hour Receiver(AHL感受性) 1 hour 4 hours… Still inactive

  4. 求められること AHL 5 hours… ③出力量  を下げる ①AHL合成量(合成速度)  を下げる ②感受性  を下げる ③RBSの   調整 ①RBSの調整 ②シグナル分子の変更

  5. シグナル分子の変更 《Cross talkを利用した実験》 Autoinducer synthase Recepter Protein LuxI LuxR lasR lasI cinR cinI RhlR RhlI

  6. シグナル分子の変更 《Cross talkを利用した実験》 ①インデューサータンパク交換実験 ②レシーバータンパク組み合わせ実験 Spot GFP 発現半径 Sender Receiver

  7. 今週の成果 LasI+LVA(C0078) CinI+LVA(C0076) RhlI+LVA(C0070) LasI(C0178) CinI(C0176) RhlI(C0170) + PCR B0034 + plac(J04500) +RBS(B0034) ptet (J13002) +RBS(B0034) + or ptet(R0040) AHL合成装置

  8. 今週の成果 CinIのLVA ナシがない! HSL合成装置作成 AHL合成装置(luxI以外のPlac系) + Plac B0034 lasI RhlI プライマーを注文中 + B0034 RhlI+LVA CinI+LVA LasI?+LVA Plac

  9. 来週の予定 ①足りないパーツの作成   (プライマー注文&ライゲーション) ②cross talk実験 ③RBSの調整

More Related