1 / 28

Paparan Bupati Bima

Paparan Bupati Bima. RENCANA PENGEMBANGAN KOTA TERPADU MANDIRI (KTM) TAMBORA KABUPATEN BIMA- PROPINSI NUSA TENGGARA BARAT Mataram , 10 Agustus 2009. Chapter 1 TENTANG KABUPATEN BIMA NUSA TENGGARA BARAT. KONDISI FISIK DAN ADMINISTRASI. LETAK GEOGRAFIS : 117º 40‘ 00“ - 119º 10‘ 00 “ BT

liang
Download Presentation

Paparan Bupati Bima

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Paparan Bupati Bima RENCANA PENGEMBANGAN KOTA TERPADU MANDIRI (KTM) TAMBORA KABUPATEN BIMA- PROPINSI NUSA TENGGARA BARAT Mataram, 10 Agustus2009

  2. Chapter 1TENTANG KABUPATEN BIMANUSA TENGGARA BARAT

  3. KONDISI FISIK DAN ADMINISTRASI LETAK GEOGRAFIS : 117º 40‘ 00“ - 119º 10‘ 00 “ BT 70º 30‘ 00“ - 71º 15‘ 57“ LS LUAS WILAYAH : 437.465 Ha TATA GUNA LAHAN: - LahanKering : 60.253 Ha ( 13,8 % ) - LahanSawah : 27.939 Ha ( 6,4 % ) - Hutan : 275.391 Ha ( 63,0 % ) - Permukimandll ;73.882 Ha ( 16,8 % ) JUMLAH KECAMATAN : 18 Kecamatan 168 desa JUMLAH PENDUDUK : 412.504 jiwadengan kepadatan : 94 Jiwa/Km2 Sumber: BimaDalamAngka, 2008

  4. VISI DAN MISI KAB BIMA VISI: “TerwujudnyamasyarakatdandaerahKabupatenBima yang Maju, Mandiri, danBermartabatberdasarkannilaimajalabodahuyang religius” MISI: Meningkatkankesejahteraanmasyarakatdenganpeningkatanpartisipasimasyarakatdalampembangunan Restrukturisasilembagapemerintahandalammeningkatkanperandanfungsistrategisaparaturpemerintahan Menerapkanperencanaandanpelaksanaan program pembangunandaerahsesuaitataruangwilayahkabupaten Meningkatkanpengelolaansemuapotensidaerahsecaraberdasarkanprinsiptransparansi, danakuntabilitassertaoptimalisasikemitraanantarpelakupembangunan Pengelolaankeuangandaerah yang efisien, efektif, transparan, danakuntabel Meningkatkankesadaran, pemahaman, danpengamalan agama bagiseluruhmasyarakat

  5. SATUAN WILAYAH PENGEMBANGAN (PERDA RTRW KAB BIMA NO 11 TAHUN 2007)

  6. INDEKS PEMBANGUNAN MANUSIA 1. Indeksharapanhidup : - PadaTahun 2004 : 57.33 Tahun - PadaTahun 2007 : 61.68 Tahun 2. Indekskemampuanpendudukmembacamenulishuruflatindanlainnya : - Tahun 2004 : 69.56 % - Tahun 2007 : 73.23 % 3. Indeksdayabelimasyarakat - Tahun 2004 : Rp. 592.600 - Tahun 2007 : Rp. 605.200

  7. Chapter 2TRANSMIGRASI DI KAWASAN TAMBORA

  8. KRITERIA KTM VS KTM TAMBORA

  9. TATA GUNA LAHAN DI KAWASAN TAMBORA Luas Kawasan Tambora ( ± 122.500 Ha)

  10. UPT BINA DAN JUMLAH KK DI KAWASAN TAMBORA

  11. SK PENCADANGAN LOKASI TRANSMIGRASI

  12. BATAS WILAYAH PERENCANAAN DAN PUSAT KTM RENCANA PUSAT KTM KAWINDA TO’I BATAS WILAYAH PERENCANAAN

  13. POTENSI KAWASAN TAMBORA

  14. SENTRA PRODUKSI SAPI KSP 1 SUB KSP : SANGGAR TAMBORA Luas areal potensi penggembalaan sapi ± 3.942 Ha areal yang termanfaatkan sebesar 3.314 Ha. Jumlah populasi Sapi 1.688 dengan jumlah peternak 766 KK

  15. SENTRA PRODUKSI JAMBU METE SENTRA PRODUKSI JAMBU METE KSP 1 SUB KSP : SANGGAR TAMBORA Luas areal potensi jambu mete ± 4.187,15 Ha areal yang termanfaatkan sebesar 183 Ha dengan nilai produksi 23,60 ton/th dan jumlah petani 323 KK.

  16. SENTRA PRODUKSI KOPI KSP 1 SUB KSP : SANGGAR TAMBORA Luas areal potensi kopi ± 3.341, 50 Ha areal yang termanfaatkan sebesar 949,50 Ha dengan nilai produksi 720 ton/th dan jumlah petani 1.266 KK

  17. PERIKANAN DAN KELAUTAN Potensi perikanan, budidaya tambak, dan budidaya mutiara, udang, bandeng, rumput laut, dan lainnya serta potensi perikanan tangkap dengan nilai produksi 2.465,8 ton/th. .

  18. WISATA PANTAI, BAHARI, GUNUNG, TAMAN MADU, TAMAN BURU DAN SITUS SEJARAH WISATA ALAM PEGUNUNGAN, TAMAN MADU DAN TAMAN BURU SITUS SEJARAH LETUSAN TAMBORA DAN KERAJAAN PEKAT, SANGGAR, TAMBORA KAWASAN WISATA PANTAI DAN BAHARI GUNUNG TAMBORA

  19. Chapter 3KOMITMEN PEMERINTAH MELALUI ALOKASI ANGGARAN DI KTM TAMBORA

  20. DUKUNGAN ANGGARAN MASING-MASING SKPD UNTUK KTM TH 2009-2012

  21. Chapter 4TentangTemuanTim Survey

  22. KetersediaanLahan • Untukpusat KTM rencanaawalberadadi So sera NaeDesaKawindaToikarenaadamasalahkepemilikanlahan (masyarakat 200m darijalanproponsikedalam) sehinggapusat KTM direlokasikesebelahtimur UPT SoriPanihi SP.2 yang termasukdalam areal pencadangansebesar 2.500 Ha • Denganrencanapusat KTM 120 Ha danlahanpembibitan 230 Ha • - Termasukdidalamnyaalokasi 1000 Ha untuktransmigrasibaru • Cadanganlahantersedia pula dalambentukEks IPK (ijinPemanfaatanKayu) diatas UPT soripanihi SP 1 dan SP 2 • Tahun 2009 pemkabbimamembuka unit permukimantransigrasibaru (UPT) Soripanihi SP 5 berlokasidi so katupadengandayatampung 200 kk (saatinibaruterisi 100 KK) • Tahun 2010 akandibangun UPT baruRadeDaradengandayatampung 200 KK

  23. PengembanganKomoditasUnggulan • KTM tamborapadaawalnyatelahmenetapkankomoditiunggulan yang akandikembangkanadalahternaksapibalidanjagunghibrida. Tetapisetelahdiadakan survey olehtimmasterplankomoditi yang layakdikembangkandanmamapuutnukberproduksidenganbaikadalahternaksapidanjambu mete • - Ketersediaansumberdaya air untukmendukungpengembangan KTM bisamemanfaatkansumber air yang adadimata air yang tersebardisepanjangkawasan KTM dengansistemperpipaangravitasi

  24. Aksesibilitas • Untuksementarainikawasantamborasesuaidengankeberadaannyasebagaisalahsatukawasantertinggaldariberbagaiaspeksehinggakehadiran program ktmjustruuntukpemberdayaanmasyarakat yang tertinggaldandapatberkembangmenjadipusatpertumbuhanekonomibaru. • UntukaksesjalansebagaisaranatrasportasiakandiupayakanmelaluidanaPemkabdanPemerintahprovinsitermasukmengupayakansumberdanadariPusatuntukmemperbaikikondisijalan yang rusak.

  25. KomponenPembentukanStrukturRuang KTM • Untukmendukungpersyaratankriteria KTM disampinglahan yang adadalamkawasantransmigrasijugadalam program pengembangankomoditimemanfaatkanlahan/areal milikmasyarakatkarena KTM tidakmengokupasilahantapijustrumemanfaatkanlahan yang adatermasuklahantidur yang belumproduktif

  26. PerkembanganKegiatan KTM • Sedangdilaksanakankegiatanmasterplanpadakawasanpengembangan KTM Tamboraolehkonsultan PT Krida… • Pelaksanaanpengembanganfisikpadapusat KTM berupajalan boulevard, pengembangunantugumasihmenungguhasilkegiatanmasterplan yang mengeluarkansiteplan detail engginering design • Kegiatan stake out sedangmempersiapkandokumenpelaksanaansetelahada site plan • Pembangunan fisikpadapusat KTM akanberakhirpadabulannovemberataudesember 2009.

  27. Dayadukungsaranadanprasarana • Dalammendukungketersediaanenergiuntukmenunjangkegiatanperkotaantelahadalistriktenaga air microhydrountukmasyarakat UPT SoriPanihi SP dariKementrian PDT • Depnakertranstahun 2010 memprogramkanlistrikPLTSuntukkebutuhanwargatransmigrasi UPT soripanihi 2, 3 dan 4

  28. TERIMA KASIH

More Related