1 / 8

AGATA Slow Control

AGATA Slow Control. Legnaro, 2009 02 19. Last meeting June 10th 2008 in Padova Not so much progress : interfaces between two WG, responsibilities and manpower. Need more coordination between DAQ and FEE Already some discussion this week, to be continued on a regular basis

lynna
Download Presentation

AGATA Slow Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AGATA Slow Control Legnaro, 2009 02 19 - Legnaro EDAQ meeting -

  2. Last meeting June 10th 2008 in Padova • Not so much progress : interfaces between two WG, responsibilities and manpower. • Need more coordination between DAQ and FEE • Already some discussion this week, to be continued on a regular basis • DAQ WG task 3 : « slow control integration » (apologize from F. Saillant). • Need for a new team ? - Legnaro EDAQ meeting -

  3. Two slow control level : • Low level (on virtex, vhdl) • High level, any language • Need connection with top level (RC) • Init/Start/Stop/Save/Restore … • state machine • web services : see Vic’s implementation • GUI, not necessarily sophisticated • Saving/restoring parameters : see Vic’s implementation • Log : see Vic’s SC • Monitoring : some tools available like spectra using GRU, rates using WS, … - Legnaro EDAQ meeting -

  4. Configurations management : how ? • Experiment topology : link between IP address / hardware / detector • Interdependences • Slow control harmonization • … • … - Legnaro EDAQ meeting -

  5. Agenda • Introduction (Christophe and/or Dino) • Short presentation of network and infrastructure (E. Calore) • Short presentation of web services (Pietro/Michele) • Digitizer slow control status (Vic) • ENX and the slow control for Orsay mezzanines (Nicolas) • Mezzanines GUI (Nabil) • GTS slow control (Joel) • The carrier slow control (Damiano) • Discussion on the carrier, GTS  and Trigger slow control (All) - Legnaro EDAQ meeting -

  6. ToDo - Priorities • Vic’s WSDL implementation • Definition of new WSDL messages • Synchronization of subsystems – sequences of actions. Document list of actions. Coordination of SC technologies • Topology • Save/Restore • Global configuration (RC) In parallel : • Monitoring • Diagnostic : replace chipscope • GUIs - Legnaro EDAQ meeting -

  7. Responsibilities • Need someone to coordinate - Legnaro EDAQ meeting -

  8. Meetings • Agata week. Tuesday afternoon ? • F2f meeting in june ? - Legnaro EDAQ meeting -

More Related