1 / 1

Page 1 of 1

Engineering & Construction Management Department. August Report , 2012. EPIA Taxiway L Reconstruction. General Project Description : R econstruct Taxiway L in its entirety (8,200 LF) as well as the taxiway radius geometries to be in accordance with FAA standards. Taxiway L.

lynna
Download Presentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department AugustReport, 2012 EPIA Taxiway L Reconstruction General Project Description: Reconstruct Taxiway L in its entirety (8,200 LF) as well as the taxiway radius geometries to be in accordance with FAA standards. Taxiway L PROJECT SCHEDULE Design Status: The design is complete. Pending Issues: None at this time Overall Project Budget (includes approved project development, design and construction costs): $15,434,000.00 Funding Source(s): Passenger Facility Charge Project Contact Project Manager: Victoria Ruiz 541-4357 Design Consultant: Parkhill, Smith & Cooper Page 1 of 1

More Related