Chapter#11 Mathematical Models FOR engineering Management Decision Making

COURSE INSTRUCTOR : PROF. DR. SHAHAB KHUSHNOOD. Chapter#11 Mathematical Models FOR engineering Management Decision Making. Lecture No. 14 Course: Engineering Management. MED DEPARTMENT, U.E.T TAXILA. INTRODUCTION.

macon
Download Presentation

Chapter#11 Mathematical Models FOR engineering Management Decision Making

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COURSE INSTRUCTOR : PROF. DR. SHAHAB KHUSHNOOD Chapter#11Mathematical Models FOR engineering Management Decision Making Lecture No. 14 Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA

  2. INTRODUCTION Mathematical Model is used to provide useful input factors in engineering management decision making. The models in this chapter basically fall into the following three areas. 1- Cost-Capacity. 2- Financial Investment Modeling. 3- Equipment Repair.

  3. Large Plant Investment Decision Models Model 1: • This model is known as cost capacity model. • In this model it is assumed that for equipment or a plant under consideration, cost data on similar equipment or plant of different capacity is available. • Thus the cost of a new equipment or plant, Kn, under consideration may be calculated by utilizing the following equation

  4. Large Plant Investment Decision Models (Cont...) Where Ks is the known cost of the similar plant or equipment of capacity Cs Cs is he known capacity of similar plant or equipment Cn is the capacity of the new plant or equipment under consideration βis the cost capacity factor

  5. Example # 1 Solution:

  6. Large Plant Investment Decision Models (Cont...) Model 2: • This model is known as the Cost Index. • This is used for comparison purposes. • A cost index for a specified period or time shows the cost at that time in relation to a given base year. • Thus the following formula is used to predict present, future or past cost.

  7. Model 2 (Cont.…) Where Kr denotes the original reference cost. Kpfpdenotes the present, future or past cost. Ir denotes the value of the index. Ipfp denotes the present, future or time value of the index.

  8. Model 2 (Cont.…) • The main advantage of this cost index is that it allows the estimator to predict the cost of the similar product design from the past time to the present or future period, without going into extensive cost analysis. • To estimate the value of the index, Ipfp, the commonly used method is known as the “Weighted Arithmetic Technique”. • Thus for m times, the index, Ipfp, is defined as follows:

  9. Model 2 (Cont.…) Where K1i denotes, for the first year, the cost of ith term; for i=1,2,3,…….,m. K0idenotes, for the base year, the cost of the ith item; for i=1,2,3,…..,m. • The above equation is known as the Simple Index because it treats all items in question equally.

  10. Model 2 (Cont.…) • This equation can be modified by assigning a weight to each item as follows: Where Wi denotes the ithterm weight; for i= 1,2,3,…,m.

  11. Example # 2 Solution:

  12. Financial Investment Modeling • This is one mathematical model to determine the optimum area to be saved by a warehouse. • It is generally accepted that as the volume of goods in a warehouse increases, the warehousing costs per dollar’s worth of goods decreases. • In this model, it is assumed that a company has a number of warehouses. • If company increases the size of its warehouses, the number of warehouses required and good warehousing costs would be reduced in return.

  13. Financial Investment Modeling (Cont.…) • Thus, the cost, K, per dollar’s worth of goods distributed in the warehouse district boundaries is given by Where K1 denotes the operating costs of the warehouse K2 denotes the goods delivery costs K3 denotes the fixed costs

  14. Financial Investment Modeling (Cont.…) However, K1, and K2 are given by K1 = Kf/v Where Kf denotes the warehouse operation fixed costs vdenotes the volume of goods per unit of time The volume must be given in dollars and K2 = Kv(a)1/2 Where a denotes the area of the district, in square miles, to which warehouse distributes its goods.

  15. Financial Investment Modeling (Cont.…) Kv denotes that cost which is assumed to vary with. The relationship, R, between volume and the area served is defined by R = v/a Putting the value of v into K1 = Kf/v gives K1= Kf/aR Putting these values into the equation of “K” gives K=Kf/aR +Kv +K3 ………………………………..(A)

  16. Financial Investment Modeling (Cont.…) • In order to minimize the cost, K, differentiate equation “A” with respect to “a” and set the resulting expression equal to zero as follows • Rearranging this equation leads to the following equation for the optimum value

  17. Engineering Equipment Repair Facility Decision Models Model 1: • This model is known as the single channel, single phase queuing model with infinite population. • The repair time t1, to repair a single piece of equipment is less than the time between arrivals, t2. • Because of no queue forms, the lost time or the waiting time has the same value as the servicing time, t1.

  18. Engineering Equipment Repair Facility Decision Models (Cont.…) • Thus, the total variable cost, K, per unit time is given by Where K1 denotes the repair cost per unit time K2 denotes the waiting cost per unit time

  19. Model 1 (Cont.…) Ks denotes the repair cost of a single piece of equipment. This cost does not include the cost of materials used for repair but includes the cost for maintaining the repair facility. Kwtdenotes the cost of waiting per piece of equipment per unit time By assuming that the repair time is an independent variable, we differentiate above equation with respect to t1 as follows dKt/dt1= -Ks/t12 + Kwt/t1…………………(1) To obtained the minimum value of Kt by setting the derivative in equation “1” equal to zero yields

  20. Model 1 (Cont.…) Rearranging gives Where t1* is the optimum repair or service time. By putting the values into equation of “Kt” leads to the optimum value of

  21. Example # 3

  22. Solution:

  23. Engineering Equipment Repair Facility Decision Models (Cont.…) Model 2: • This model is the result of further development on Model 1. • The only difference between this Model and Model 1 is that this one has “M” service or repair channels instead of only one.

  24. Model 2 (Cont.…) • Thus, one can write directly the equation for the “M” channel arrangement total variable cost, Kmt, per unit time as follows where θ= t1/t2

  25. Model 2 (Cont.…) Setting the derivative of this equation equal to zero results in Rearranging gives

  26. Model 2 (Cont.…) Where “t1*” denotes the optimum value of “t1” Substituting this equation for “t1” gives Where “Kmt” denotes the optimum value of “Kmt”.

  27. THANKS