1 / 21

G OBIERNO REGIONAL DE LORETO .

G OBIERNO REGIONAL DE LORETO. S UB REGION REQUEN A |. MESA DE TRABAJO PRESUPUESTO PARTICIPATIVO 2007. Ing. CLEVER AREVALO PINEDO Gerente. IQUITOS ABRIL 26, 27 DEL 2006. I. OBJETIVOS. DETERMINAR LA METODOLOGÍA Y LOS MENANISMOS A SEGUIR EN LA ELABORACIÒN DEL PPTO. PARTICIP. 2007

macy-holden
Download Presentation

G OBIERNO REGIONAL DE LORETO .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GOBIERNO REGIONAL DE LORETO. SUB REGION REQUENA | MESA DE TRABAJO PRESUPUESTO PARTICIPATIVO 2007 Ing. CLEVER AREVALO PINEDO Gerente. IQUITOS ABRIL 26, 27 DEL 2006.

  2. I. OBJETIVOS • DETERMINAR LA METODOLOGÍA Y LOS MENANISMOS A SEGUIR EN LA ELABORACIÒN DEL PPTO. PARTICIP. 2007 • DEFINIR LAS METAS DE INVERSIÓN 2007 EN COORDINACION CON INSTANCIAS PUBLICAS Y SOCIEDAD CIVIL.. • IDENTIFICAR LOS PROYECTOS DE INVERSION A TODA FUENTE PARA EL AÑO 2007 • ENUMERAR LAS PRINCIPALES OBRAS A EJECUTAR, EN EL PERIODO FISCAL 2007. • INDICAR LA OBRAS DE MAYOR IMPACTO SOCIO ECONÓMICO EN LA COMUNIDAD REQUENINA.

  3. II.LOGROS. 2003 - Culminación Pavimentación Calle Requenillo - Culminación Pavimentación Malecón Graú - Culminación Muro Perimétrico Calle Nicolás Giner - Culminación CEPS Manco Capac - Culminación CEPS Bretaña y Losa Deportiva - Culminación Refacción CEPS-Tamanco. 2004 - MANTENIMIENTO Y REFACCIÓN COBERTURA CEI. P.PERU 22,231. 83 -MANTENIMIENTO Y REFACCION CEP REQUENILLO 10,464. 68 -REFACCION POZO ARTESIANO CEPS PALP. 19,477.00 -DISTRIBUCION MOBILIARIO ESCOLAR -AMPLIACION SISTEMA AGUA POTABLE. 85% AVANCE

  4. -Electrificación Carachama -VEREDAS PEATONALES –CONVENIO PROGRAMA A TRABAJAR URBANO:Malecón Grau, Calle Manaos, Malecón Bolognesi, Calle San Martín. -IMPLEMENTACION CON MOBILIARIO CASA DE REPOSO 52,000.00 2005 - CONSTRUCCION DE 5 AULAS. AMBIENTES ADMINISTRATIVOS Y SS.HH CEI-ANEXO N. GINER. - ACCESO MINI MUELLE - REPINTADO IEP “PALP”. - Refacción CEP Libertad, Capitan Clavero, Frontera, Nvo. Paraiso - Refacción Botiquines Comunales y Puestos de Salud: Progreso, Sinchi Roca y Curinga.

  5. III. OBRAS EN EJECUCIÓN • ACCESO MINI PUERTO REQUENA • AGUA POTABLE DE REQUENA-RED DE DISTRIBUCIÓN. • CONST. IMPLEM. C. SALUD IBERIA.

  6. IV. PRESUPUESTO PARTICIPATIVO 2005 SECTORLOCALIZACION MONTO AVANCE DISTRITAL % Vvda. Saneamiento • Desagüe F.de Punga Capelo S/ 433,500 0 Salud • C. Salud J.Herrera J.Herrera 325,900 0 • C. Salud S.Roque Maquia 300,000 0 • C. Salud Iberia Tapiche 258,518 10 Educación • Const. IEPP-Manaos Requena 398,933 0

  7. Const. IEPP Sgto Lores Requena 300,000 MPR. • Const. IEPS Sinchi Roca Requena 300,000 0 • Const. IEPI N.Giner Requena 321,076 100 Transporte • Const. Embar. Bretaña Puinahua 200,000 0 • Acceso Minimuelle Requena 1’905,540 70

  8. V. BANCO DE PROYECTOS • Const. Coliseo Cerrado Requena • Infraestructura Sub Región Requena • Agua Potable San Roque Maquía • Desagüe Flor de Punga Capelo • Agua y Desagüe Bagazán Sapuena • Carretera Requena –J. Herrera • Agua y Desagüe Santa Elena Alto Tapiche • Producción y Procesamiento CamuCamu • Agua Potable Curinga Soplin • Electrificación J. Herrera J.Herrera • Carretera J.Herrera – Colonia Angamos

  9. VI.OBRAS PROGRAMADAS POR EJECUTAR 2006 • Relleno, canalización y Pavimentación calle Nicolás Giner - Requena • Construcción IEP-Barrio Manaos - Requena • Construcción Casa de Fuerza y Red Secundaria Bretaña - Puinahua • CEP- Santa Fe. - Maquia • Construcción Centro Salud Jenaro Herrera • Ampliación Sistema Eléctrico-Jenaro Herrera • Anillo Vial-Requena

  10. VII.OBRAS DE IMPACTO-I SEMES- TRE 2006 • Culminar sistema de agua y desagüe de Reque na para ampliar servicio a 24 horas. • Relleno, alcantarillado y pavimentación calle Nicolás Giner.

  11. REQUENA AHORA

  12. CATEDRAL

  13. PLAZA SAN FRANCISCO

  14. V I S T A S. LOGROS

  15. I. E.P.I NICOLAS GINER

  16. TANQUE RESERVORIO AGUA POTABLE

  17. ACCESO MINIMUELLE

  18. MINIMUELLE

  19. GRACIAS

More Related