An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HT-7 ASIPP Daily operation report May 18-19, 2004 Operation team III 赵君煜,吴振伟,朱玉宝,凌必利,朗芳, 童兴德,高丽,丁永华,潘亚平,徐强

  2. HT-7 ASIPP Schedule 上午, 控制机器(PC)打补丁, 杀毒. 10:00~24:00开始放电, PSI抽气速率与加料位置对壁滞留的影响。 shots# 68811~68863 ne(0)~1.0E19m-3, Ip~100KA, It~3800~3900A 24:00~08:00, IBW(28.5MHz),和IBW+LHCD实验。 shots# 68880~68920 ne(0)~1. 25E19m-3, Ip:120~130KA, It~3200~4200A LHCD~200KW; IBW~250KW

  3. PSI 抽气速率实验

  4. IBW实验,在ECE上和Ha上的反映

  5. IBW对纵场扫描

  6. ASIPP Fueling & Pumping effect on WR (May 19) Yang Yu Pumping effect: Fueling effect: Conclusion: Difference is not clear with the present measuring configuration.