1 / 11

Electronic system for obtaining construction and occupancy permits

Streamline the process of obtaining construction and occupancy permits with an electronic system. Reduce delays and improve efficiency in dealing with permits and project expertise. Easily access information and complete procedures online.

mckenzie
Download Presentation

Electronic system for obtaining construction and occupancy permits

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE Electronic systemfor obtaining construction and occupancy permits Dealing with construction and occupancy permits Construction sites going without comprehensive project expertise Rating : 61st place among 190 countries www.arxkom.gov.az

  2. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS CONSTRUCTION SITES GOING WITHOUT COMPREHENSIVE PROJECT EXPERTISE 6566AZN 116 Fee Number of Days 18 Number of Procedures BEFORE AFTER 1595AZN 38 Fee Number of Days 7 Number of Procedures www.arxkom.gov.az

  3. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS PROCEDURES (BEFORE) 18 procedures – 116 days – 6566 AZN Fee Registration of construction passport in Baku City Executive Power Feedback from Ministry of Ecology and Natural Resources Feedback from hygiene and epidemiology center Engineering-exploration work 3 Obtaining technical conditions from 5 6 Feedback from State Fire Protection Servise “Azərsu” OJSC (15 days) (15 days) (15 days) (1 day) (10 days) (14 days) Inspection of engineering and communication works Inspection of structural works during construction (Ministry of Emergency Situations) Inspection of foundation works (Ministry of Emergency Situations) Inspection of labor inspectorates and other institutions during construction (Ministry of Economy) Inspection of roofing works (Ministry of Emergency Situations) 8 9 10 7 11 12 Appeal to Baku City Executive Power for Construction permit (Ministry of Emergency Situations (1 day) (1 day) (1 day) (1 day) (10 days) (1 day) 16 18 13 14 15 17 Environmental impact assessment at the site Inspection from State Fire Protection Service Connection to the water line (“Azərsu”OJSC) Final Inspection (Ministry of Emergency Situations) Getting occupancy Permits Registration in the State Registry Baku City Executive Power (Ministry of Ecology and Natural Resources) Ministry of Emergency Situations) (9 days) (1 day) (7 days) (30 days) (1 day) (1 day) www.arxkom.gov.az

  4. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS www.arxkom.gov.az

  5. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Application for getting construction permit and receiving construction permit based on “one-stop shop” principle Within the framework of this phase, all work is done within 15 (fifteen) working days to decide whether to grant permits or refuse permission. The customer does not make any payments for the construction permit.* 15 Work days * In accordance with the Decree #460, obtaining construction permits orapprovals have been exempted from any charge (Art. 1.6 of the Construction and Occupancy permit Regulation for Select Construction projects (including warehouses) approvedbythePresidentialDecree No.460 of December 28, 2018) www.arxkom.gov.az

  6. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Issuing construction permits based on “one-stop shop principle New e-service system obtains all technical conditions and approvals on behalf of applicant • Getting technical conditions from utilities (10days) • "Azersu” OJSC • “Azerishiq” OJSC • “Azerigas” Production Union Obtaining approvals (5days) Ministry of Ecology and Natural Resources; Ministry of Health (relevant to requirements of hygiene and epidemiology center); Ministry of Emergency Situations (relevant to fire protection requirements). All technical conditions requests and approvals are centralized through the new e-service system based on one stop shop. www.arxkom.gov.az

  7. DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Risk-based approach to the inspection regime has been introduced with regard to low-risk buildings (such as warehouses) • The state control over the construction is carried out only at the base of the installation and at the final stage; • "Registry of State Supervision in Construction" is not required for warehouses. Upon completion of the construction and installation works, an occupancy act is prepared, which reflects the requirements of the urban development and construction documents and the construction project and completion of the state control over the construction. State control (Receive inspection of foundation works) State construction inspection is carried out State Agency for Construction Safety Supervision of the Ministry of Emergency SituationsandState Building Inspection of the State Agency for Construction Supervision 1Day State control (Receive final inspection) 1Day

  8. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Issuing occupancy permit for completed construction projects Issuing an occupancy permit of a completed construction site is carried out by an authorized institution based on the "One-stop shop" principle through new e-service system. The customer does not have to pay any fees for receiving the occupancy permit. 10Days * In accordance with the Decree #460, obtaining construction permits orapprovals have been exempted from any charge (Art. 1.6 of the Construction and OccupancypermitRegulationforSelectConstructionprojects (includingwarehouses) approvedbythePresidentialDecree No.460 of December 28, 2018) www.arxkom.gov.az

  9. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Registration of property rights on a construction object Registration of property rights on a construction site is governed by law and is not an integral part of the permit for construction permits. 4days * In accordance with the Resolution of the Cabinet of Ministers, #134, dated April 6, 2018. www.arxkom.gov.az

  10. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE DEALING WITH CONSTRUCTION AND OCCUPANCY PERMITS Statistics on implementation of the new e-service system 01.01.2019 – 20.04.2019 • 19applicants received construction permits • 4 applicants received occupancy permits

  11. AZERBAIJAN REPUBLIC CENTER FOR ANALYSIS OF ECONOMIC REFORMS AND COMMUNICATION AZERBAIJAN REPUBLIC STATE COMMITTEE FOR URBAN PLANNING AND ARCHITECTURE Thank you! www.arxkom.gov.az

More Related