This document provides updates on machine operations, experiments, and meeting notes from January 20, 2009. It also includes Fulvia Pilat's top 10 wish list and feedback from the Retreat 2008.

Download Presentation

Operation Notes APEX Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operation NotesAPEX Status Machine Experiments Meeting January 20, 2009 Fulvia Pilat

  2. MCR’ s top 10 wish list (from Greg Marr presentation at the Retreat 2008) • Straightforward polarimetry identify responsible person for polarimeter operations identify list of operations and expert activities and measurements • RHIC Injection without idiosyncrasies improvements BPMs • A Ramp Manager/model that won’t foil tape, Lisa, OrbitDisplay, RampEditor… 2 task forces on Ramp software during the shutdown • PASS that works faster • PASS with less failure ACS group manpower increased over the shutdown, AGS/Booster upgrade planned • Our fingers on the keyboard • A fully revertible machine • Lab-view applications that run and dump themselves • One answer from one source • A list of exceptions smaller than the list of rules

  3. Retreat 08 – feedback from experiments • Communication propose automatic notification from MCR of polarization measurement (phone calls not reliable). • Results of Vernier scans Analyzed and delivered timely to machine and experiments • No change of operations planning, configuration, especially before weekends make optimal use of Monday scheduling meeting • Effective use of 9 o’clock meeting (and meetings in general) Communicate with experiments upfront, before system reports (Run coordinator) Make sure people from experiments are up-to-date on issues Control of backgrounds needs to improve Auto-orbit corrections every ½ hr affect backgrounds  needs to be accompanied by auto collimator adjustments that follow orbit movement at collimators

  4. APEX Run-8: studies with d-Au 08-36 0A IBS with decoupling transverse stochastic cooling 08-17 0A Test of ramp and operations with beta*< 0.8m + beta* measurements – 2 techniques + test of IP knobs  30+% luminosity 06-31 0A ORM Measurements beta beat correction (only partial) 07-33 0A Tune and chromatic drift correction at injection in operations 08-14 0A Collimation on the ramp ~operational 08-27 0A AC dipole optics measurements, corrections 08-29 0A Polarimeter profiles  emittance at injection, store 08-34 0A Beta beat measurement corrections at injection, store 08-17 0A Injection drift correction operational now 08-06 0A Nonlinear chromaticity measurements 08-01 1A Electron cloud location performance limits 08-18 1A Stability threshold at transition performance limits 08-07 1B Energy Loss of Debunched Beam fundamental measurement 08-02 1B Au31+ in AGS operations RHIC low energy, GSI 08-24 1B Gold-77 in RHIC  cooling (to be confirmed)

  5. APEX Run-8: studies with P-P 08-17 0A Beta*=0.6m operations this run (luminosity) 08-42 0A Near integer WP  not operational (without orbit control) 08-13 0A Collimation efficiency collimation system upgrade 08-45 0A Polarimeter studies  improvements needed for high bunch intensity 08-06 0A Chromaticity measurement, feedback Hybrid Tune Tracker 08-04 0A Impedance localization data possible impedance reduction 07-03 0A Coherent spin precession  design of RHIC spin flippers 08-16 0A RF phasing  non operational for PP due to beam loading 08-41 0A Longitudinal Vernier scan  operations optimization

  6. APEX Run-8: what did not get done…only bigger “ticket items” d-Au: • Convincing linear optics corrections (many attempts and progress but nothing operational yet….) • (further) development of IBS lattice P-P: • Spin experiments, in general • Long-range beam beam study (wires) • Demonstration of chromaticity feedback • Optics for PP-2-PP

  7. APEX Workshop December 4-5 2008

  8. APEX Workshop

  9. Plans for Run-9 Program limited to P-P experiments 250 GeV 5 weeks of physics 100 GeV ~9 weeks of physics Deadline proposals: January 15  January 30 Asked to update status of Run-7 and 8 proposals Meeting AEAC: 1st week in February Weekly APEX Friday Meetings resume January 23 Collection of APEX Results