1 / 10

Airline Community Views-FABEC

TO REPLACE IMAGE: Click on the picture, h it Delete Click the ‘Add Picture ’ icon Find your image & click ‘Insert’ Under the ‘ Format’ tab, click the ‘Crop’ button to adjust the position within the shape

michealc
Download Presentation

Airline Community Views-FABEC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TO REPLACE IMAGE: • Click on the picture, hit Delete • Click the ‘Add Picture’ icon • Find your image & click ‘Insert’ • Under the ‘Format’ tab, click the ‘Crop’ button to adjust the position within the shape • ** In order for the ‘Crop’ button to appear, please make sure you keep the shape selected at all times Airline Community Views-FABEC FABEC RP3 Performance Plan R. Sergison

  2. RP2 Progress • Performance targets for Environment and capacity not met • Significant underspending of determined cost in RP2 by EUR -382m • Significant economic surplus from en-route activity EUR 373m • What are the FABEC deliverables in terms of enhanced cooperation and integration across borders? • Increased cooperation? • Integration of human and technical resources? • Why continue? What will change?

  3. TEXT FORMATTING / LIST LEVELS • To change the text formatting or list level: • Highlight the paragraph or sentence • From the Home tab, select the ’Increase List Level’ button • Click the button once to remove the blue subtitle • Click again to add the first level bullet point etc • To go back a level, use the ‘Decrease List Level’ button General Observations - Draft RP3 PP • Same borders, same routes, same roles – MORE COST • Cost developments lack transparent justification and CBAs • Unconsolidated plan, e.g. investments • “Planning to Fail” • Lacks transparency • Compensation approach when a Performance approach is needed • Airspace users are losing trust

  4. TEXT FORMATTING / LIST LEVELS To change the text formatting or list level: • Highlight the paragraph or sentence • From the Home tab, select the ’Increase List Level’ button • Click the button once to remove the blue subtitle • Click again to add the first level bullet point etc • To go back a level, use the ‘Decrease List Level’ button Safety • The intention to meet the EU Wide Safety Targets is strongly supported • Some data sharing to date, but no identified synergies leading to cost-efficient or more effective oversight/ application • EoSM, RAT (GND/ OVL), JC progressing at different speeds • Transparency of individual NSA and ANSP proposal needed

  5. TEXT FORMATTING / LIST LEVELS • To change the text formatting or list level: • Highlight the paragraph or sentence • From the Home tab, select the ’Increase List Level’ button • Click the button once to remove the blue subtitle • Click again to add the first level bullet point etc • To go back a level, use the ‘Decrease List Level’ button Environment • KEA target not in line with Reference Values is strongly opposed • ANSPs must keep building efficient airspace and watering down environmental targets will increase CO2 emissions. • Figures do not reflect abolishing mitigation measures in 2021 due to investments/promised ATCO availability • Projects planned in order to deliver must be prioritized • Historical performance suggests little confidence in FABEC to deliver • Robust plan and commitment at ANSP and state level is essential

  6. TEXT FORMATTING / LIST LEVELS To change the text formatting or list level: • Highlight the paragraph or sentence • From the Home tab, select the ’Increase List Level’ button • Click the button once to remove the blue subtitle • Click again to add the first level bullet point etc • To go back a level, use the ‘Decrease List Level’ button Capacity • Enroute ATFM delay not in line with Reference Value is strongly opposed • Proposed value for 2020 is 5 times the reference value • 400% deterioration • Does not reflect 2019 reality and removal of mitigation measures in 2021 due to investments/promised ATCO availability etc. NM delay predictions are over-estimated as a baseline. • Current investment and costs increase is sufficient to close the capacity gap. • Projects planned to deliver are not identified

  7. Incentives • CRSTMP limitation is not supported • In the case of FABEC a Penalty only scheme should be developed to manage performance • Achievement of both FAB and individual State targets must the priority, this will drive the changes required by Airlines • Current Incentive Scheme targets not supported as its actually rewards underperformance. Bonus should be only allowed if there is a real improvement and targets are challenging enough.

  8. Cost Efficiency • Proposed cost increases are disproportionally high compared to weak capacity and environmental targets. • DC must be properly managed to achieve DUC in line with EU-wide target • EU-wide target currently not met based on available information. • Issues with pensions and extremely favorable conditions to staff need to be addressed. • Capex must be adjusted for RP2 underspend, transparent, justified by robust CBA and phased to reflect historical performance • Poor transparency

  9. TEXT FORMATTING / LIST LEVELS To change the text formatting or list level: • Highlight the paragraph or sentence • From the Home tab, select the ’Increase List Level’ button • Click the button once to remove the blue subtitle • Click again to add the first level bullet point etc • To go back a level, use the ‘Decrease List Level’ button Next Steps • The AUs want very much for FABEC to succeed • FABEC is desperately lacking ambition and a real plan • Rationalize infrastructure across FABEC • Consolidate support functions across FABEC • Potential to move more sectors to MUAC – vertical and lateral • Can’t or won’t do it – break-up FABEC

  10. TO REPLACE IMAGE: • Click on the picture, hit Delete • Click the ‘Add Picture’ icon • Find your image & click ‘Insert’ • Under the ‘Format’ tab, click the ‘Crop’ button to adjust the position within the shape • ** In order for the ‘Crop’ button to appear, please make sure you keep the shape selected at all times Thank you • Rory Sergison • sergisonr@iata.org • www.iata.org

More Related