1 / 5

TALKING ABOUT VALIDATION CAMPAIGN… TOLNET DEPLOYMENT AT TMF

TALKING ABOUT VALIDATION CAMPAIGN… TOLNET DEPLOYMENT AT TMF. TM-2 ¼ mile away. TMF H2O lidar. TOPAZ lidar. TROPOZ lidar. TMF O3 lidars. LMOL lidar. Balloon launch area. AT lidar. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL). Northeast High Desert (elev. 4000 ft).

Download Presentation

TALKING ABOUT VALIDATION CAMPAIGN… TOLNET DEPLOYMENT AT TMF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TALKING ABOUT VALIDATION CAMPAIGN…TOLNET DEPLOYMENT AT TMF TM-2¼ mile away TMF H2O lidar TOPAZlidar TROPOZlidar TMF O3 lidars LMOLlidar Balloonlauncharea ATlidar

  2. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) NortheastHigh Desert(elev. 4000 ft)

  3. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) SoutheastSan Bernardino(urban)

  4. “TM-2” LOCATION (TOPAZ + TROPOZ OR LMOL) South: LA Basinbehind “blue ridge”

  5. LASERS SYNC SUGGESTION At TM-2: TOPAZ 1 kHz  /20  50 Hz to TROPOZ At TM-21: LMOL 1 kHz  /33  30 Hz to JPL AT (50 Hz)  /5  to H2O lidar NO SYNC NEEDED BETWEEN TM-2 AND TM-21(1/4 MILE DISTANCE) ALTERNATE SCHEME: At TM-2: TOPAZ and LMOL 1 kHz , TOPAZ tilted At TM-21: TROPOZ 50 Hz  /3  150 Hz  /5  30 Hz to JPL

More Related