1 / 28

IMPLEMENTASI JAKTRANAS LAPAN

IMPLEMENTASI JAKTRANAS LAPAN. RAKOR PERENCANAAN RISTEK-LPNK 2013. Bappenas Kemenkeu DPR KEMENPAN-RB. POLA BISNIS. Program- Anggaran -SDM. IPTEK POLITIK NEGARA ???. ANGGARAN : $ 50-60 JUTA?????? Zero growth- Moratorium SDM. LAPAN. Pelayanan / Service. Pengguna khusus

Download Presentation

IMPLEMENTASI JAKTRANAS LAPAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMPLEMENTASI JAKTRANAS LAPAN RAKOR PERENCANAAN RISTEK-LPNK 2013

  2. Bappenas Kemenkeu DPR KEMENPAN-RB POLA BISNIS Program-Anggaran-SDM IPTEK POLITIK NEGARA ??? ANGGARAN : $ 50-60 JUTA?????? Zero growth- Moratorium SDM LAPAN Pelayanan/ Service Penggunakhusus Instansi Pemerintah Pengguna Ilmiah masyarakat umum User

  3. VISI LAPAN Kemandirian -kemampuanmenguasai, mengembangkan, memanfaatkan -membangundayasaingnasional KualitasKehidupanBangsa: Ekonomi, SosialdanBudaya KesejahteraanBangsa “TERWUJUDNYA KEMANDIRIAN DALAM IPTEK PENERBANGAN DAN ANTARIKSA UNTUK MENINGKATKAN KUALITAS KEHIDUPAN BANGSA”

  4. MISI LAPAN • Pembinaan, penguasaandanpemanfaatanteknologiroket, satelitdanpenerbangan; • Pembinaan, penguasaandanpemanfaatanteknologidan data penginderaanjauh; • Pembinaan, penguasaandanpemanfaatansainsantariksadanatmosfer serta • Penyusunan Kebijakan kedirgantaraan;

  5. VISI IPTEK 2025 POLA PIKIR • selarasdenganvisidankebijakanstrategispembangunanindustri • IPTEK harusmenjadipolitiknegara(????) • arah dan kerangka kebijakan • sumberrujukan JAKSTRANAS EksistensidanhargadiribangsainiHANYAakanbisadipertahankanjika IPTEK sebagaielemendasarkehidupanberbangsadimasadepandapatdikuasaidandidayagunakan. RENSTRA KL (DALAM PEMBANGUNAN IPTEK) - LAPAN

  6. Wilayah Pengabdian Virtual KomponenAbstrak Komponenkongkrit Personal concept

  7. Wilayah Pengabdian Virtual KomponenAbstrak Komponenkongkrit

  8. Langkah Pertama :Reorganisasi Lembaga • KonsitenPadaKompetensiInti • Eliminasikegiatan Yang TidakEfektif – mengurangipikiran/ kegiatanabstrak yang sulitdiwujudkan • IkutiPeraturanPerundanganUntuk LPNK • IkutiReformasiBirokrasi Deputi Teknologi Dirgantara Pusat Teknologi Wahana Dirgantara Pusat Teknologi Terapan Pusat Teknologi Elektronika Digantara Deputi Teknologi Dirgantara Pusat Teknologi Roket Pusat Teknologi Penerbangan Pusat Teknologi Satelit

  9. LangkahKedua :TentukanPetaJalanUntukSetiapPilar PetaJalanharusrealistis – SDM, FASILITAS, ANGGARAN

  10. Program LSA Rancangbangun LSA berbasis Icon 5 Amphibius Kerjasama dgn PT.DI Rancangbangun ICON-L 2013 TU Berlin-Stemme 2014-2015 TU Berlin-Stemme 2012 MRV • Output : • 1.Master on Aircraft Design • 2.Aircraft Modification • Long endurance • Hybrid Power • Modular Structure • ATOL(air travel org lis) • Simulator System GMS Output: 1.Mission Design Doc 2.Conceptual Design Doc Output : 1.Mission Modification for S15 2.Application / Operation

  11. S-15 Stemme • Mode TerbangAutomatis • Terbang s/d 8 jam • Dibangundalamkerjasama LAPAN dengan TU Berlin Jerman

  12. RENCANA AKUISISI DATA SATELIT PENGINDERAAN JAUH SATELIT OLEH STASIUN BUMI LAPAN (2012-2020) RESOLUSI SPASIAL RENDAH RESOLUSI MENENGAH. RESOLUSI TINGGI RADAR YANG TELAH DITERIMA DATA YANG AKAN DITERIMA Satellite YANG AKAN DILUNCURKAN DAN AKAN DITERIMA STASIUN BUMI LAPAN

  13. Langkah Tiga :Penguasaan Bertahap 60 km/jam 100 km/jam 200 km/jam

  14. LangkahEmpat :SegeraMasyarakatkanHasilKegiatan Merapi Banjir Kampung pulo

  15. Fotobersama TIM UAV LAPAN dan TNI AL SelesaiPengujianTerbang

  16. Langkah Lima :Berguru TU Berlin 1. Satelit – desain, komponen-test, integrasi-test 2. Light Surveylance Aircraft Korea Selatan Production Line Propelan Ukraina 1. Nozel RX-550 2. TabungKomposit Australia Pengolahan Data PenginderaanJauh – Membangun Standard – BerbagiPengalaman

  17. Langkah Enam :Perkuat Sarana Prasarana Plasma Coating Alat Uji Sistem Kendali Mixer Propelan Antena S B. Parepare

  18. Langkah Tujuh :Perkuat Aspek Legal INPRES No: 6/2012 • menyediakan data satelitpenginderaanjauhresolusitinggidenganlisensiPemerintah Indonesia; • meningkatkankapasitasdanoperasisistemakuisisi data satelitpenginderaanjauhresolusitinggi; up grade SB • melaksanakanpenyediaan data satelitpenginderaanjauhresolusitinggisesuaidenganketentuanperaturanperundang-undangan; • melakukanpengolahanatas data satelitpenginderaanjauhresolusitinggiberupakoreksiradiometrikdanspektral; • membuat metadata atas data satelitpenginderaanjauhresolusitinggisesuaidenganStandarNasional Indonesia; • melakukanpenyimpanan data satelitpenginderaanjauhresolusitinggi; dan • bersamaKepalaBadanInformasiGeospasialmelakukanpengendaliankualitasterhadap data satelitpenginderaanjauhresolusitinggi. “

  19. LAPAN melayanikebutuhan data penginderaanjauhresolusirendah, menengahdantinggiuntukseluruhinstansipemerintahpusat PenguatanInfrastrukturPenginderaanJauh LAPAN untukmenjadiNasional Remote Sensing Center

  20. RUU Keantariksaan Pembahasan denganKomisi VII DPRTahapPembahasan PANJA - DIM

  21. LangkahDelapan :Bikin Kantor MenjadiKeren • mencerminkansemangatpenghuni • mendorongmotivasi

  22. Langkah Sembilan:Manfaatkan Momentum – BangunKerjasama REDD Plus MaratoriumPenebanganHutan PengembanganIndustriPertahanan Program TugasBelajarKementianRistek LatihanGabungan TNI PenangananPerbatasan PenggalianPotesiPerpajakan (Perkebunan, Perhutanan, Pertambambangan, Permukiman)

  23. Implementasi Kerjasama dengan TNI-AL • LAPAN membantu TNI-AL untukmeliputujirudaldiperairan • Perlupengembangankemampuanjelajahdari 30 menitmenjadi 2 jam setengah • Perlupengembangandayamuat

  24. Kerjasama Dirjen Pajak Penggalianpotensipajakberbasis data penginderaanjauh SISTEM INFORMASI PERPAJAKAN NASIONAL BERBASIS PENGINDERAAN JAUH

  25. KerjasamaDirjen Perhubungan Udara

  26. WHAT NEXT (2015-2019) • PENGUATAN ASPEK LEGAL PEMBANGUNAN KEANTARIKSAAN (PERATURAN PEMERINTAH, RENCANA INDUK, STANDARDISASI, dll) • MELANJUTKAN PENGEMBANGAN – KSM, P3 • PENGEMBANGAN SDM • PENGUATAN KERJASAMA- PROGRAM BERSAMA DALAM NEGERI – KONSORSIUM • PENGEMBANGAN PENGGUNA (PERLUASAN PEMANFAATAN) MEMBANGUN KEGIATAN SKALA NASIONAL - LINTAS • KL (FOC DAN REA)

  27. Mohon Doa Restu

More Related