140 likes | 143 Views
This document discusses various software synergies and applications for the LIU commissioning meeting, including beam control, measurement systems, trajectory measurement, cycle editing, tuning measurement, scheduling, spill correction, and RF applications.
E N D
LIU-Commissioning MeetingOP application software https://wikis.cern.ch/pages/viewpage.action?pageId=122064804D.Cotte D.Cotte - BE/OP/PS LIU-PSCM, 04 June 2019
Kickers Control • New FESA class • New interlock (PPM based) + EC • Concern : KFA71, KFA45 • Application responsible: P.Leduc (PS) / V.Barbet(PSB) LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
OASIS • Application responsible: R.Maillet (PS) • Collaboration BE-CO Beam Shape Measurement • Application responsible: R.Maillet (PS) • Collaboration BE-RF, BE-BI LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Beam Gaz Ionization • Application responsible: M.Coly (PS) -> Software synergies • Optic from LSA table • Collaboration BE-BI • New Vistar in collaboration with BE-CO Fast Wire Scanner • Application responsible: JF.Comblin (PSB) ) -> Software synergies • New bunch by bunch features (new hardware) • Optic from LSA table • Number of bunches (manual or automatic from Sampler) • Collaboration BE-BI LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
SemGRID/FIL • Application responsible: JF.Comblin (PSB) • New turn-by-turn measurement (new Hardware) • New equipment before TOF target • Interlock with RAL12 for SemGrid in PS-Ring • Collaboration BE-BI Beam Loss Monitor • Application responsible: P.Leduc (PS) • Integration of new BLM (TT2, EAST) • Vistar adaptation : BE-CO LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Trajectory Measurement System(TMS) • PS Orbit application : A.Akroh (PSB) • Pre-LS2 : BE-BI expert application was used. • Linked with LKTIM tree for harmonic changes. • Collaboration BE-BI LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
POPS Cycle Editor PPPL2 Start-up PPPL0 PPPL1 PPPL3 Phaseback • PS MPS editor : P.Freyermuth (AD) • Same Application as pre-LS2. ) -> Software synergies • Based on PPPL (Parabola-Parabola-Parabola-Linear) segment for FGC52 (non-transactional) • Collaboration TE-EPC LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Tune (+Chromaticity) measurement • Qmeter application : P.Freyermuth (AD) • Already used in many different machines (PS, PSB, LEIR, AD) • FESA class modification : Acquisition system upgraded to properly support the quadrupolar measurements • Keep old application (JAVA) or new application based on python ? (M.Coly) -> Software synergies • Collaboration BE-BI LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Auto scheduling of timing sequence • New supercycleoptimizer : S.Easton (PS) • Save time programming the sequences (SC composition) • Collaboration : BE-CO LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Spill correction / OP Display SE61 • Replace Bernard’s OpDisplay for Slow extraction: S.Easton (PS) • Makerule + possible client for linked timing trees. • Collaboration BE-CO LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
RF specific applications • Longitudinal injectionoscillations. (Rodolphe & Pierre) • Energymatching, PSB->PS and/or LEIR->PS (Rodolphe & Pierre) • Virtualization of 40 MHz (and later 80 MHz) RF phase programs (Denis) • MakeRulesset to calculate the total RF voltage at the principal harmonic (JMN, Denis, SMWG) • Simple MakeRules for RF. (Denis) • Collaboration BE-RF, SMWG LIU-PSCM, 04 June 2019 D.Cotte - BE/OP/PS
Software Development LIU-PSCM, 04 June 2019 D.Cotte BE/OP/PS