An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Post Installation Inspection (PII) of Storm Pipe” AASHTO Sub-Committee of Materials (SCOM) Joins the Conversation

  2. Current Inspection Tools/Standards • WHAT Can you Tell Me??? • History, Contents, www.concrete-pipe.org

  3. PII 2005 – Now????? • Share Your Experience and Lessons Learned • And THEN I will tell you mine www.concrete-pipe.org

  4. AASHTO Sub-Committee of Construction (Recognizes a need & Fills the Gaps) www.concrete-pipe.org

  5. Step by Step…Inch by Inch(History of Development 2011 – 2013) Slide 5

  6. AASHTO Sub-Committee of MaterialsRoadways and Structures Tech. SectionStorm Pipe PII and Evaluation Guidelines www.concrete-pipe.org

  7. 1. SCOC Guideline addresses Techniques to gather inspection information and allows both MANUALand REMOTEmethods for Inspection of Installed Pipe.

  8. Tools – Man-Way Access (Pipe 36” + up) AASHTO - SCOC

  9. TOOLS – Remote Access (less 36”) AASHTO - SCOC

  10. SCOC Guideline… • Strongly suggest measurement for • Cracks • Deflection • Joint Gap • Provides Eval Criteria for camera inspection only www.concrete-pipe.org

  11. 2. - The people completing the INSPECTIONSare required to be properly trained and certified and the TOOLSthey use are required to be certified for accuracy.

  12. 3. SCOC Guidelines discuss Post Installation Inspection Report and requires Written Description , Location, & Still Image of any issue of concern found during the inspection. www.concrete-pipe.org

  13. Why are Clear & Reasonable Evaluation Guidelines Important? www.concrete-pipe.org

  14. "Decision is the spark that ignites action. Until a decision is made, nothing happens.... Decision is the courageous facing of issues, knowing that if they are not faced, problems will remain forever unanswered." Wilfred A. Peterson Answers Pipe Eval. World = Accept As Is Repair & Accept Remove & Replace…. www.concrete-pipe.org

  15. AASHTO SCOC – Evaluation Decisions 4. SCOC - includes RCP Evaluation Criteria for Misalignment, Joint Issues, and Cracks. The Joint Evaluation for RCP includes evaluation criteria for both Silt-tight, and Leak Resistant joints. www.concrete-pipe.org

  16. AASHTO Bridge -Thermoplastic • Misalignment • Joints • Cracks • Buckling, Bulging racking • Deflection • SCOC Same ISSUES WITH DETAILED EVAL. DECISION INFO Slide 16

  17. Detailed Eval.Plastic/CMP www.concrete-pipe.org

  18. 5. Must USE a Tool to get any WORK done….Use Care…. www.concrete-pipe.org

  19. Taking “it” to the Street….. www.concrete-pipe.org

  20. I Am All Ears….for your ?’s