1 / 3

NWP related activities @ Slovak Hydrometeorological Institute 2005

NWP related activities @ Slovak Hydrometeorological Institute 2005. ALADIN @ SHMI (1). HPC: IBM @server pSeries 690 Type 7040 Model 681 32 CPUs POWER 4+ 1.7 GHz 32 GB RAM Memory IBM FAST T600 Storage Server EXP700 1.5TB AIX 5.2 NEW ARCHIVE: HW: IBM Total Storage 3584

natan
Download Presentation

NWP related activities @ Slovak Hydrometeorological Institute 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NWP related activities@ Slovak Hydrometeorological Institute2005 EWGLAM/SRNWP meeting

  2. ALADIN @ SHMI (1) HPC: IBM @server pSeries 690 Type 7040 Model 681 32 CPUs POWER 4+ 1.7 GHz 32 GB RAM Memory IBM FAST T600 Storage Server EXP700 1.5TB AIX 5.2 NEW ARCHIVE: HW: IBM Total Storage 3584 Tape Library (24 TB) SW: IBM Tivoli Storage Manager one.shmu.sk 2882x2594 km domain size 320x288 points in quadratic grid [2.19 ; 33.99 SW] [39.06 ; 55.63 NE] 9.0 km horizontal resolution 37 vertical levels 400s time step 54h forecast length 4x/day 00/06/12/18 UTC coupled to ARPEGE 3h coupling frequency dynamic adaptation mode AL28T3_czphys EWGLAM/SRNWP meeting

  3. ALADIN @ SHMI (2) OPERATIONAL and R&D highlights • 01/07/2004: full operational status • 01/01/2005: 24/7 human monitoring • 12/01/2005: switch to +54h integration • 31/03/2005: AL28T3_czphys operational • 25/07/2005: 06UTC run introduced • 21/09/2005: wind dynamical adaptation operational • 29/09/2005: 18UTC run introduced • Feasibility study of MOS technique • Case study of 19/11/2004 severe windstorm • 6-10/06/2005 15th ALADIN workshop (Bratislava) EWGLAM/SRNWP meeting

More Related