1 / 12

Problems identification of existing distribution systems

Problems identification of existing distribution systems. By : Eng. L. L. A. Peiris DGM ( Central). 1.0 Introduction.

Download Presentation

Problems identification of existing distribution systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Problems identification of existing distribution systems By : Eng. L. L. A. Peiris DGM ( Central)

  2. 1.0 Introduction • Regional Support Centre – Central consists of Kandy, Matale & Nuwara-Elya districts and O&M sections is managed by three O&M Managers (Kandy East, Kandy North, Kandy South). • GOSL is planning to provide additional 400,000 new service water connections by 1st Quarter 2015. • Inline with the above project RSC- C is planning to provide 43,100 number of new service connections. MATALE KANDY NUWARA ELIYA Cont ……

  3. 2.0 Objective • To present the problems identified in existing distribution systems of Central Region. Cont ……

  4. 3.0 General Scope of Works • Supply of required pipes and fittings • Laying of distribution pipe lines • Provision of new service connections • System Improvements Intake improvements Increase carrying capacities of lines Introduce new control devices Bundle pipe/under depth pipes/ AC lines replacement Cont ……

  5. 4.0 Issues observed in distribution systems 4.1) Pipe line Extensions • Time taken for purchasing pipes, fittings and pumps etc • Documents are based on the data provided by OICs and may lead to issues of reliability • Time limitations to carry out network analysis and provision of Engineering drawings (Subsequently contractor submit the survey data) • Time limitations in the assessment of carrying capacity existing distribution systems • Possible no. of connections may vary depends on the actual requirements • Getting approval from relevant Road Authorities. i.e. Breaking of Asphalt /tar layer, reinstatement ( temporary and permanent ) • Contractor has to work in large coverage area • Connections to the existing system and interruptions Cont ……

  6. 4.0 Issues observed in distribution systems Cont …… 4.1) Pipe line Extensions Cont… • Availability of back filling material • Obstacles in pipe laying in trenches( i.e. Rocks, roots, service ducts of other service providers, etc.) • Traffic diversion issues • Shifting of pipe lines due to road widening • Providing rider mains in asphalt /tar roads • Dealing with regulatory bodies such as Police Cont ……

  7. 4.0 Issues observed in distribution systems Cont …… 4.2) Provision of Service Connections • Delays in obtaining approvals for road crossings, damages to carriage way. • Delays associated with the purchasing materials • Payments related to individual service connections • Due to limitation of allocated time frame , pressure testing of the pipe lines will be done after providing service connection of the pipe line.(i.e. after fixing Ferrule , clamp saddle, etc.) • Delaying due to lack of required documents to provide service connections • Land problems to lay the service line • Proper safety arrangements • Pack Numbering , delaying in document transferring to main office, billing & collection problems. Cont ……

  8. 4.0 Issues observed in distribution systems Cont …… 4.3) System Development • Additional time requirement to complete the analysis & design • Unforeseen delays in purchasing materials • Delays and contractual issues creating unexpected construction process • Obstructions regular complains from community Cont ……

  9. 5.0 Possible delays in obtaining approvals • RDA/PRDA/ PS road Approvals. • Land acquisition . • Bridge Crossings / Railway crossing • Electricity Supply • Getting Approval from Mahaweli Authority • Approval from Environmental Authority Cont ……

  10. 6.0 Logistical Support • Additional staff requirement • Transport Facilities • Other logistical requirements • Computers • Survey equipment • Purchasing unforeseen extra materials ( pipes and fittings)

  11. DISCUSSION

  12. The End Thank you For Your Participation

More Related