Comite River Diversion Project DOTD Organization C hart

Comite River Diversion Project Status Update November 7, 2018 Bobby Duplantier, USACE Patrick Landry, DOTD. Comite River Diversion Project DOTD Organization C hart. Comite River Diversion Project USACE Organization C hart. Non-Federal Partner Roles . DOTD Project Tasks 2018-2022.

nickolasj
Download Presentation

Comite River Diversion Project DOTD Organization C hart

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comite River Diversion Project Status Update November 7, 2018Bobby Duplantier, USACEPatrick Landry, DOTD

  2. Comite River Diversion ProjectDOTD Organization Chart

  3. Comite River Diversion ProjectUSACE Organization Chart

  4. Non-Federal Partner Roles

  5. DOTD Project Tasks 2018-2022

  6. US Highway 61 Utilities • West-side Relocations: • 3 of 5 pipelines • 2 transmission lines • 2 communication fibers • East-side Relocations: • 3 of 4 pipelines • 1 distribution line • 5 communication fibers • All Utility Relocations currently under design • American Midstream Relocation Construction begins November 2018

  7. Bridge design and construction will continue simultaneously throughout the project life. LA 19- Bridge and R/R Bridge Construction Start: 2020 LA 67- Bridge Construction Start: 2020 LA 964- Bridge Construction Start: 2020 US 61- Bridge and R/R Bridge Construction Start: 2019

  8. Comite River DiversionTentativeDelivery Plan for the Project Note: Project requirements and completion dates may be subject to change as designs are refined and impacts quantified.

  9. Comite River DiversionTentativeSchedule Note: Project requirements and schedules may be subject to change as designs are refined and impacts quantified.

  10. Simultaneous Construction tasks along the Comite Channel

  11. Questions ?? For additional information please contact: LADOTD: Christina Brignac, P.E christina.brignac@la.gov Or Susan Douglas, P.E. susan.douglas@la.gov USACE: Bobby Duplantier Bobby.Duplantier@usace.army.mil