1 / 12

建站中心 7 月第二周工作总结及下周计划 —— 徐阳姣

建站中心 7 月第二周工作总结及下周计划 —— 徐阳姣. 目录. 1. 2. 3. 4. 5. 上周重点工作情况分析. 1 、 业绩目标工单: 12 。 结果:上周工单完成 4 单。 2 、 栏目架构整理确定 。 结果:未完成。 3 、 薪资颁布 结果:未进行,相关制度还未明确(长沙那边未确定)。 4 、 黄帅与刘冲后台网站制作 结果: C+ 网站模版切片。. 业绩预估达成分析. 1 、业绩目标 12 单,达成 6 单,完成率 50% ; 2 、人均效能: 6 单 /4 人 =1.5 单、 6 单 /6 天 =1 单;

niles
Download Presentation

建站中心 7 月第二周工作总结及下周计划 —— 徐阳姣

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 建站中心7月第二周工作总结及下周计划 —— 徐阳姣

  2. 目录 1 2 3 4 5

  3. 上周重点工作情况分析 1、业绩目标工单:12。 结果:上周工单完成4单。 2、栏目架构整理确定。 结果:未完成。 3、薪资颁布 结果:未进行,相关制度还未明确(长沙那边未确定)。 4、黄帅与刘冲后台网站制作 结果:C+网站模版切片。

  4. 业绩预估达成分析 1、业绩目标12单,达成6单,完成率50%;2、人均效能:6单/4人=1.5单、6单/6天=1单; 2、制作任务12单,完成新单制作任务4单,内部工单2单;

  5. 业绩预估达成分析 分析:1 、修改内容频繁,资料添加及栏目增加及修改比较大;

  6. 业绩预估达成分析 1、本周验收网站上线数:9个;

  7. 业绩预估达成分析 1、共计:15个网站修改;2、工作效能:15个/6天=2.5个;

  8. 业绩预估达成分析 正在完善中的单: 1、岳阳市高朋轩饮食服务有限公司 7.12收到客户网站效果图确认函,预计7.18完成制作。 2、湖南洞庭山科技发展有限公 效果图设计当中(此客户比较纠结,设计要求比较泛,有待多沟通。) 3、岳阳旅游局 预计7.15号制作完成。 4、汨罗市乐普电气材料有限公司 预计7.16号制作完成。 5、岳阳市天盛装饰设计工程有限公司 预计7.15号完成效果图设计。

  9. 上周团队问题分析以及解决办法 1、服务器数据备份手动备份太慢,一天只能备份1-200个文件; 解决方案:向长沙的韩立平有请教,长沙部门有自动备份的软件,不知道是否可以申请此软件也用于岳阳? 2、本周一位设计师加入部门工作;

  10. 下周业绩目标 任务目标:12单 达成方案:

  11. 下周重点工作 业绩工单 工作交接 其他重点工作 与张海潮交接工作流程事宜; 检查张海潮对产品知识的了解度; 薪资及绩效制度跟进; 业绩目标工单:12;

More Related