1 / 19

LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY

LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY. LANGDON LIBRARY - HISTORY. 1890 Woodbury Langdon bequeaths books and money to town of Newington for library 1892 Library constructed 1893 Library dedicated 1913 Addition constructed 1969 Addition proposed by librarian Marjorie Pickering.

Download Presentation

LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LANGDON LIBRARY~FROM 1892 TO THE 21ST CENTURY

  2. LANGDON LIBRARY - HISTORY • 1890 Woodbury Langdon bequeaths books and money to town of Newington for library • 1892 Library constructed • 1893 Library dedicated • 1913 Addition constructed • 1969 Addition proposed by librarian Marjorie Pickering • 1970 Small “wings” (bathrooms, storage) added to 1913 addition • 1971 Phase 2 (Children’s Room) of addition “temporarily shelved” • 2013 Addition & renovations proposed

  3. LANGDON LIBRARY NEEDS • Structural and system upgrades • Repair rotten sills in basement • Repair support beams in attic

  4. LANGDON LIBRARY NEEDS • Attic is non-accessible and not rated for book storage • Can be used for light storage only

  5. LANGDON LIBRARY NEEDS • Support beams have split, slipped, and shifted over years • October 2012 earthquake may have exacerbated damage

  6. NEWINGTON LOVES ITS LIBRARY In 2011, per capita, we were 16th busiest library out of 234 in the state! In 2012, we were even busier with 8,802 patron visits!

  7. A MODERN LIBRARY NEEDS • More (and more flexible) square footage to support a wide variety of activities & programs • More shelf space for expanding collections • Improved energy efficiency to lower operating costs • Floor plan that allows current staffing levels to oversee entire building • Dedicated acoustically separated children’s room • Dedicated staff work room for materials processing • Dedicated quiet rooms for tutoring, proctoring, tax prep, quiet study, computer training, private meetings, etc.

  8. FLEXIBLE SPACE MEANS • Space is available for story time & crafts, film screenings, book discussions, author visits, historic displays, art, etc. • Dedicated quiet spaces to serve small groups • A library ready to serve needs as they evolve into the future

  9. SHELVES ARE PACKED • Currently library has only 1,000 linear feet of shelf space • Shelves are at or near capacity now • No room to grow the collection or to display materials • No room to house and display historic books and materials

  10. EXPANDED SHELVING SPACE • Would double shelf capacity to support next 50 years of book, movie, game, and technology acquisitions • Allow us to properly protect and display original Woodbury Langdon collection

  11. BETTER ENERGY EFFICIENCY • Take advantage of Southern exposure for passive solar • Modern lighting controls to reduce electricity use • Improved insulation for improved building envelope • Latest HVAC for efficient heating, ventilation, and air-conditioning year-round • Design goals include: • Green operations • Sustainable maintenance • LEEDs-eligible efficiency standards

  12. NATIONAL LIBRARY STANDARDS By Thomas A. Ladd, MLS 6,612 sq.ft

  13. NEWINGTON SPACE NEEDS 896 ft2 Shelf Space 575 ft2 Program Space 100 ft2 Kitchenette 200 ft2 Chair Storage 240 ft2 Small Group Space 300 ft2 Multi-use Space 360 ft2 Comfortable Seating 480 ft2 Crafts / Story Space 100 ft2 Storage 200 ft2 Computer Space 150 ft2 Circulation Desk 445 ft2 Staff Space 360 ft2 Restrooms 300 ft2 Lobby Space 0 ft2 Mechanical in Basement 300 ft2 Stair 5,006 ft2 Subtotal Area 1,250 ft2 25% net-gross 6,256 ft2 Total Library recommended 6,019 ft2 Proposed Design

  14. LANGDON LIBRARY OVERVIEW • Re-grading of surrounding grounds to eliminate need for access ramps • Angle-in parking saves grass and doubles available parking • Trees taken will be used/sold • Town forest unaffected

  15. NEW LIBRARY FLOOR PLAN Red circles = wheelchair turning radius Blue = reused existing fixtures from old library

  16. BREAK DOWN OF COSTS • New Addition: $1,352,168 ($224.65 per ft2) • Existing Library Repairs: $366,000 (if done in conjunction with expansion) • Fire Suppression: $172,459 (cistern, pumps) • This yields a Guaranteed Maximum Price of: $1,890,627

  17. TAX IMPACT • The quoted interest rate for a 5 year bond (as of 2/26/13) is 2% • This yields a $0.40 per thousand impact on the tax rate • The median home in Newington is valued at $500,000 (per 2010 state census) • The average home would pay $16.67 per month

  18. WHAT IF WE JUST FIX IT? • The cost to fix the library alone (without the addition) would go up by $100,000-$150,000 in construction cost alone. • This is because certain aspects would not be at a reduced rate associated with a “bigger” job • Fire suppression still needs to be provided (cistern) • Fixing the building means that ADA compliancy MUST be met- the library is NOT exempt as being in the historic district • Therefore, nearly ½ of the existing items in the library would need to be removed and stored (at an additional cost) • The library would need to be closed for several months during the process

  19. THE NEW Langdon library!

More Related