1 / 11

WP 7

WP 7. SERVICES AND DATA ACCESS. OBJECTIVES. Provision of useful data coming from most of the Jerico partners Compliant with SeaDataNet and MyOcean standards and requirement + 3 TOPs (Targeted Operation Phase) Multi parameters maps on monthly basis

norton
Download Presentation

WP 7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 7 SERVICES AND DATA ACCESS PARIS – Maison de la recherche - 24 & 25 May 2011

  2. OBJECTIVES • Provision of useful data coming from most of the Jerico partners • Compliant with SeaDataNet and MyOcean standards and requirement • + 3 TOPs (Targeted Operation Phase) • Multi parameters maps on monthly basis • Data & demonstrative products from fishing vessel probes • Collocated data from buoys and ferryboxes PARIS – Maison de la recherche - 24 & 25 May 2011

  3. SCHEDULING • SA time scale of 2 years for data access, starting month 20 up to month 43 (from 1st of January 2013 to end of December 2014) • SA time scale of 1 year for TOPs, starting month 34 up to month 43 (from 1st of January 2014 to end of December 2014) PARIS – Maison de la recherche - 24 & 25 May 2011

  4. MODALITY OF ACCESS • Open to all European users via the portal • Data discovery, data downloads + display • Right of access needed, same as SDN • Registration / identification • Acknowledgement on right of access, use of data, publications through a MOU • + commitment on dissemination of results through the portal for TOP users PARIS – Maison de la recherche - 24 & 25 May 2011

  5. MONITORING • Indicators • Number of data made available • Number of dowload data • Number of requested information (hits). • Specifications for all SA providers • RT Data Management Handbook: Month 8 • DM Data Management Handbook: Month 8 • Hot line available during the SA period PARIS – Maison de la recherche - 24 & 25 May 2011

  6. OVERALL AGENDA • Questionnaire to all providers : Month 6 • Data management handbook (x2): M8 • Return of the fulfilled questionnaires to the WP leader (Ifremer): M12 • Portal tests: M18 & 19 • SA period: M20 to M43 • TOP period: M32 to M43 • Service provision: M48 PARIS – Maison de la recherche - 24 & 25 May 2011

  7. JERICO Data ManagementPlanning • Month 8 : Data Management guidelines provided to data providers • for real-time and delayed mode • Procedures, formats, … • Available tools and operation manuals • Month 8 – Month 18 : Installation phase • Installation of data management tools by data providers • Preliminary tests with Jerico data • Support and training if necessary (by SeadataNet2 & MyOcean) • Month 20  : Data management phase • Data archiving and distribution in real-time and delayed mode • TOP data sets : inter comparison between several observing systemse.g. Buoys + Ferry Box at buoys location and same timeMonth 30 – Month 32 : preparation of TOP datasets PARIS – Maison de la recherche - 24 & 25 May 2011

  8. TOP ACTIVITIES • TOP 1: One year of multi parameters maps on the European seas, using EMECO tools. • TOP 2: Data and demonstrative products on a monthly basis, collected from sensors on board fishing vessels. • TOP 3: Data from buoys and collocated Ferry Box line, respectively in the south Aegean Sea and in the Kattegat. PARIS – Maison de la recherche - 24 & 25 May 2011

  9. Ifremer SYKE IBWPAN NIVA IMR OGS CNR HCMR NERC (POL) MUMM SMHI MI PdE Blue Lobster (TOP1) If + CNR (TOP2) NIVA + HCMR + SMHI (TOP3) SA PARTNERS PARIS – Maison de la recherche - 24 & 25 May 2011

  10. REQUIREMENTS • One contact name and email per partner • Commitment to make data freely available to the consortium during the SA period • Information on data: (questionnaire) • Type of data (T°, S, …) and Metadata • Delay of availability • Acquisition parameters • Advance for WP7 will be delivered when the questionnaire will be completed. PARIS – Maison de la recherche - 24 & 25 May 2011

  11. What to be done by data providers? • Describe observing system, observatories and, optionally, sensors (metadata) • Type/generate metadata information to describe Jerico observing system • Put the harmonized data files on an ftp server using the define structure • Check data quality • Real-time : • Harmonize format using provided tools (file format converter, if necessary) • Put harmonized data files on an ftp server using the define directory structure • Delayed mode : • Send data to your National Oceanographic Data Centre (NODC)which is able to perform long term preservation and distributionor • Install data access management tool (if not already done)and connect it to your own data management system • Generate data set description • Precise guidelines and manuals will be made available in Month PARIS – Maison de la recherche - 24 & 25 May 2011

More Related