Progress of Riga and Pieriga Mobility Plan (RRMP)

This article provides an overview of the progress and implementation of the Riga and Pieriga Mobility Plan (RRMP) by the Ministry of Transport and Communications of the Republic of Latvia. It includes information on the procurement plan, steering committee, project coordinator, and development of major infrastructure projects in Riga. The article also mentions feasibility studies on the left bank of Daugava and the connection of Riga airport to the main road network.

oberlin
Download Presentation

Progress of Riga and Pieriga Mobility Plan (RRMP)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress of Riga and Pieriga Mobility Plan (RRMP) Andulis Židkovs Deputy State Secretary, Head of Responsible Authority MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  2. Procurement Plan and Implementation of RPMP MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  3. Steering Committee (MoT, Riga City, Municipalities, “Latvian Railway”, “Passenger Train”, “Riga Traffic” and other stakeholders Working group (MoT, Riga City) Project coordinator of Ministry of Transport Contractor for RPMP RPMP management structure MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  4. Structure of RPMP (content) • Assessment of existing situation • Setting up and approval of goals to be reached • Development of modelling system (based on existing EMME/2) • Elaboration of various scenarios for development of transport system • Detailed elaboration of recommended scenario • Elaboration of Working program for implementation of selected scenario MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  5. Development of major infrastructure projects in Riga • Transfer of port activities out from city centre to the Krievu sala (CF): • Construction 2010 -2013 • Transfer of activities after 2013 • Modernization of infrastructure of Riga airport and access roads (CF): • Construction 2010-2013 • Construction of new passenger terminal in airport Riga– 2010 -2012 (PPP project) MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  6. Other important infrastructure projects • Reconstruction of Riga railway junction – partly enssure access to the port terminals on the left bank of Daugava– 2010- 2013 (CF) • Construction of railway access road to the Riga airport (Rail Baltica branch) – 2011- 2014 (CF) MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  7. MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA

  8. Feasibility studies on the left bank of Daugava • Supporting feasibility studies before implementation these projects: • “Feasibility Study on Railway Routes to the Port Terminals on the left bank of the Daugava River and to the International Airport “Riga”” - need to be prolonged until 2010! (2004/LV/16/C/PA/001) • “Technical Assistance Project “Renovation of Riga Railway Network” -need to be prolonged until 2010! (2004/LV/16/C/PA/001) • Connection of Riga airport to the main road network and Riga city – 2009 – 2010 All activities above are included in ToR of RPMP and must be considered within elaboration process! MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA