1 / 2

TI 8 beam commissioning 24/25 May 2008 / V.Mertens / LTI coordination meeting / 5.6.2008

TI 8 beam commissioning on 24/25 May 2008. TI 8 beam commissioning 24/25 May 2008 / V.Mertens / LTI coordination meeting / 5.6.2008. Coordination of the beam commissioning by OP. Test closure and DSO test done on 16 May.

osanna
Download Presentation

TI 8 beam commissioning 24/25 May 2008 / V.Mertens / LTI coordination meeting / 5.6.2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TI 8 beam commissioning on 24/25 May 2008 TI 8 beam commissioning 24/25 May 2008 / V.Mertens / LTI coordination meeting / 5.6.2008 Coordination of the beam commissioning by OP. Test closure and DSO test done on 16 May. TI 8 test scheduled between 24 May 8:00 and 25 May 24:00, with an interruption over night. RP survey scheduled for 26 May 8:00; allotted intensity: 5*10^13 p. DSO (draft) memo to authorise beam operation received Friday evening, “under conditions and with compensatory measures” (related to access protection). Discussion in CCC with OP, DSO, … on 24 May 10:30  authorisation to start (EDMS 923932). SPS access to investigate why the beam didn’t pass in TT20 (unrelated to TI 8). TI 8 work finally started at around 12:30. TBSE80243 gave always interlocks, even if out of the beam. Fixed by M.Donze. TED400354 was blocked in (from earlier tests). First shot down TI 8 at 14:07: first shot unsteered … traj. after some steering … BTVI87750 (J.Wenninger)

  2. TI 8 beam commissioning on 24/25 May 2008 TI 8 beam commissioning 24/25 May 2008 / V.Mertens / LTI coordination meeting / 5.6.2008 In the following a lot of measurements done (see other presentations) until about 22:20 … … when suddenly the 18 kV cable supplying TI 8/CNGS broke down, putting an end to the test (beam for slightly over 8 h by then). Overall not much “new territory” explored; main results from 2004 confirmed. Total intensity used to this point approx. 6*10^12 p (about 10 % of intensity “budget”). All in form of single “pilot” bunch (approx. 6*10^9 p/shot); S-cycle length 25.2 s. RP survey as foreseen on Monday 8:00, with re-opening of the zones at around 9:30. Only new radiation zone 10 m into UJ88 and ~20 m backwards into R88, including LHC machine (but not the passage next to the LHC). Latest post-test news: 18 kV cable repaired in < 1 week (bad splice), but remains a single point of failure for LHC + CNGS. For TI 2: access protection rel. work, prior to test on 14/15 June, to be coordinated by ABP/RTL. (Helmut Vincke)

More Related